LOG IN / HELP

Announcements

Theron Sowers
Apr 6, 10:45 a.m.

Please complete San Ardo Buffer Zone then Round Mountain 2. Thanks!

Open jobs

San Ardo (April 13, 2018)

139 open, 0 underway, 2947 closed
Description

Enter all well construction data and log headers

Instructions

Enter:
(1) Well metadata for each well, if missing.
(2) Run metadata for each run.
(3) Log curve descriptions for each run.
(4) Temperature and resistivity observations for each run.

Kern Front QC (June 1, 2020)

298 open, 1 underway, 232 closed
Description

QC all well construction and header information. Do not worry about glogs.

Instructions

QC all data (well construction, run header, g-log curves, mud/temperature).

Completed jobs

RoundMountain2 (March 30, 2020)

0 open, 0 underway, 425 closed
Description

Enter the following fields:
Well Construction: All Fields
Run Fields: Service company, Tool, Date, Run number, Driller depth, Logger depth, Log bottom, Log top, Notes, Temperature and Resistivity data.
Do not enter curve names.

Instructions

Add run headers for SP and resisitivity curves. (Mud properties affect the interpretation of these curves.) Skip run headers for porosity logs.

San Ardo Buffer Zone (April 6, 2020)

0 open, 0 underway, 499 closed
Description

Enter all information, including g-log catalog. For g-logs, we are only looking for:
*SP
*GR
*All available resistivity
*All available porosity
*Bit
*Caliper
*Temperature

Do not log anything else.

Instructions

Enter:
(1) Well metadata for each well, if missing.
(2) Run metadata for each run.
(3) Log curve descriptions for each run.
(4) Temperature and resistivity observations for each run.