LOG IN / HELP

<<< BACK TO JOB

Elk Hills Sharepoint import: 03055109

Well construction data was imported from SharePoint, and may conflict with what was already in this database. Look for change log entries with CONFLICT and resolve each conflict. Make a note in the change log if there is an interesting reason for the conflict.

This task is closed and unheld.

See DOGGR well records.

Well construction

Name
Spud date 2014-09-05
Abandon date
Borehole orientation Directional
Measured depth 4352.000
True vertical depth 4335.980
Tperf 2600.000
Bperf 3770.000
Water geochem
No well data
Glog unavailable
Notes

Run headers

Suppress hidden runs

Service company Halliburton
Tool GAMMA RAY CEMENT BOND LOG
Date 2014-09-10
Run number One
Driller depth 4346.000
Logger depth 4286.000
Log bottom 4269.000
Log top 0.000
Casing size
Bit size 10.625
Mud type Water
Mud density 8.45
Mud visc (plastic)
Mud visc (funnel)
Mud ph
Mud fluid loss
Sample source
Circulation stopped time
Logger on bottom time
Time since circulation
Operating rig time
Notes

G-log curves

2014-09-10 One
AMP
AMP x 5
CCL
GR
TT

Temperature and mud resistivity observations

Change log


31749 2018-06-07 13:13 ashley CLOSED, UNHANDED
31749 2018-06-07 13:13 ashley EDITED RUN One (Sept. 10, 2014)
31749 2018-06-07 13:12 ashley EDITED WELL METADATA
31749 2018-06-07 13:08 ashley TAKEN
31749 2018-01-10 16:23 whdc TASK CREATED
21657 2018-01-09 14:48 SHAREPOINT IMPORT (mu2) spud_date,tperf,measured_depth,water_geochem,borehole_orientation,notes
21657 2018-01-09 14:48 TASK CREATED
4733 2017-11-11 15:09 eramirez CLOSED, UNHANDED
4733 2017-11-11 15:09 eramirez EDITED RUN One (Sept. 10, 2014)
4733 2017-11-11 15:07 eramirez ADDED RUN One (Sept. 10, 2014)
4733 2017-11-11 15:03 eramirez TAKEN
4733 2017-10-05 09:53 mloustale TASK CREATED
21657 2017-01-06 23:53 ashley CHECKED WELL METADATA (SHAREPOINT)
21657 2017-01-06 23:53 sharepoint-RMB EDITED WELL METADATA (SHAREPOINT)

Well versions and related tasks

Well 03055109