Well construction data was imported from SharePoint, and may conflict with what was already in this database. Look for change log entries with CONFLICT and resolve each conflict. Make a note in the change log if there is an interesting reason for the conflict.
This task is closed and unheld.
Name | |
Spud date | 2011-02-03 |
Abandon date | |
Borehole orientation | Directional |
Measured depth | 5555.000 |
True vertical depth | 5141.670 |
Tperf | 4720.000 |
Bperf | 5470.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes | Active well |
Service company | Schlumberger | Schlumberger | Schlumberger | Halliburton |
Tool | PHASOR DUAL INDUCTION AND ARRAY INDUCTION TWO INCH PRESENTATION | PHASOR DUAL INDUCTION AND ARRAY INDUCTION TWO INCH PRESENTATION | PHASOR DUAL INDUCTION AND ARRAY INDUCTION TWO INCH PRESENTATION | ARRAY COMPENSATED TRUE RESISTIVITY 2"=100' |
Date | 1994-09-26 | 1994-10-08 | 1994-10-29 | 2011-02-14 |
Run number | 1 | 2 | 3 | ONE |
Driller depth | 2605.000 | 6345.000 | 10160.000 | 5555.000 |
Logger depth | 2604.000 | 6344.000 | 10133.000 | 5534.000 |
Log bottom | 2598.000 | 6327.000 | 10127.000 | 5522.000 |
Log top | 320.000 | 2592.000 | 6325.000 | 4863.000 |
Casing size | 20.000 | 13.375 | 9.625 | 7.625 |
Bit size | 17.500 | 1.250 | 8.500 | 6.750 |
Mud type | LSND | LSND | LVT OILBASE | LSND |
Mud density | 72.00 | 78.00 | 10.00 | 8.80 |
Mud visc (plastic) | 50.00 | 63.00 | 49.00 | |
Mud visc (funnel) | 43.00 | |||
Mud ph | 8.00 | 8.00 | 8.50 | |
Mud fluid loss | 13.80 | 9.20 | 5.00 | |
Sample source | FLOWLINE | FLOWLINE | FLOWLINE | FLOWLINE |
Circulation stopped time | 19:31:00 | 19:30:00 | ||
Logger on bottom time | 21:45:00 | 23:49:00 | 02:30:00 | 19:20:00 |
Time since circulation | 15.000 | 24.800 | ||
Operating rig time | ||||
Notes | Fluid loss is in cptm |
27304 | 2018-01-19 14:35 | ashley | CLOSED, UNHANDED |
27304 | 2018-01-19 14:35 | ashley | EDITED RUN 3 (Oct. 29, 1994) |
27304 | 2018-01-19 14:34 | ashley | EDITED RUN 2 (Oct. 8, 1994) |
27304 | 2018-01-19 14:34 | ashley | EDITED RUN 1 (Sept. 26, 1994) |
27304 | 2018-01-19 14:33 | ashley | EDITED RUN ONE (Feb. 14, 2011) |
27304 | 2018-01-19 14:30 | ashley | EDITED WELL METADATA |
27304 | 2018-01-19 14:27 | ashley | TAKEN |
27304 | 2018-01-10 16:23 | whdc | TASK CREATED |
26001 | 2018-01-09 14:49 | SHAREPOINT IMPORT (mu2) spud_date,tperf,measured_depth,water_geochem,borehole_orientation,notes | |
26001 | 2018-01-09 14:49 | TASK CREATED | |
9127 | 2018-01-02 13:10 | powen | CLOSED, UNHANDED |
9127 | 2018-01-02 13:10 | powen | EDITED RUN 1 (Sept. 26, 1994) |
9127 | 2018-01-02 13:10 | powen | EDITED RUN 2 (Oct. 8, 1994) |
9127 | 2018-01-02 13:09 | powen | EDITED RUN 3 (Oct. 29, 1994) |
9127 | 2018-01-02 13:07 | powen | ADDED RUN 3 (Oct. 29, 1994) |
9127 | 2018-01-02 13:04 | powen | EDITED RUN 2 (Oct. 8, 1994) |
9127 | 2018-01-02 13:03 | powen | EDITED RUN 1 (Sept. 26, 1994) |
9127 | 2018-01-02 13:03 | powen | ADDED RUN 2 (Oct. 8, 1994) |
9127 | 2018-01-02 13:01 | powen | EDITED RUN 1 (Sept. 26, 1994) |
9127 | 2018-01-02 13:00 | powen | ADDED RUN 1 (Sept. 26, 1994) |
9127 | 2018-01-02 12:53 | powen | EDITED RUN ONE (Feb. 14, 2011) |
9127 | 2018-01-02 12:51 | powen | ADDED RUN ONE (Feb. 14, 2011) |
9127 | 2018-01-02 12:48 | powen | TAKEN |
9127 | 2017-10-05 09:53 | mloustale | TASK CREATED |
26001 | 2017-04-08 00:53 | ashley | CHECKED WELL METADATA (SHAREPOINT) |
26001 | 2017-04-08 00:53 | sharepoint-LR | EDITED WELL METADATA (SHAREPOINT) |
Well 03042485