LOG IN / HELP

<<< BACK TO JOB

Mount Poso: 02912121

Enter:
(1) Well metadata for each well, if missing.
(2) Run metadata for each run.
(3) Log curve descriptions for each run.
(4) Temperature and resistivity observations for each run.

This task is closed and unheld.

See DOGGR well records.

Well construction

Name
Spud date 1965-12-23
Abandon date
Borehole orientation Vertical
Measured depth 1616.000
True vertical depth
Tperf 1434.000
Bperf 1519.000
Water geochem
No well data
Glog unavailable
Notes

Run headers

Service company GO WESTERN
Tool ELECTRICAL LOG
Date 1965-12-24
Run number 1
Driller depth 1616.000
Logger depth 1616.000
Log bottom 1615.000
Log top 100.000
Casing size
Bit size 9.875
Mud type CLAY BASE
Mud density 70.00
Mud visc (plastic) 50.00
Mud visc (funnel)
Mud ph
Mud fluid loss
Sample source FLOWLINE
Circulation stopped time
Logger on bottom time
Time since circulation
Operating rig time
Notes

G-log curves

1965-12-24 1
18'8" LATERAL A-32" - B - 17'4" - N - 50'10" - M
LONG NORMAL A-64" - M - 65'6"-N-∞-B
SHORT NORMAL A -16"-M-18'8"- N-∞-B
SPONTANEOUS POTENTIAL

Temperature and mud resistivity observations

1965-12-24 1
Rm = 6.900 Ωm @ 97.000 °F (MRT, 1616.000 ft)
Rm = 7.800 Ωm @ 86.000 °F
Rmc = 6.500 Ωm @ 97.000 °F
Rmf = 6.200 Ωm @ 97.000 °F

Change log


91726 2019-10-23 13:14 LexieMiranda CLOSED, UNHANDED
91726 2019-10-23 13:14 LexieMiranda EDITED RUN 1 (Dec. 24, 1965)
91726 2019-10-23 13:12 LexieMiranda ADDED RUN 1 (Dec. 24, 1965)
91726 2019-10-23 13:10 LexieMiranda EDITED WELL METADATA
91726 2019-10-23 13:09 LexieMiranda TAKEN
91726 2019-10-14 14:42 tsowers TASK CREATED

Well versions and related tasks

Well 02912121