LOG IN / HELP

<<< BACK TO JOB

San Ardo Buffer Zone: 05301129

Enter:
(1) Well metadata for each well, if missing.
(2) Run metadata for each run.
(3) Log curve descriptions for each run.
(4) Temperature and resistivity observations for each run.

This task is closed and unheld.

See DOGGR well records.

Well construction

Name
Spud date 1964-08-27
Abandon date 1968-04-29
Borehole orientation Vertical
Measured depth 1735.000
True vertical depth
Tperf 1694.000
Bperf 1734.000
Water geochem
No well data
Glog unavailable
Notes

Run headers

Service company Go Western
Tool Electric Log
Date 1964-06-28
Run number 1
Driller depth 1735.000
Logger depth 1739.000
Log bottom 1738.000
Log top 189.000
Casing size
Bit size 9.875
Mud type Mud
Mud density
Mud visc (plastic)
Mud visc (funnel)
Mud ph
Mud fluid loss
Sample source
Circulation stopped time
Logger on bottom time
Time since circulation
Operating rig time
Notes

G-log curves

1964-06-28 1
RESISTIVITY 18'8" LATERAL A-32"-B-17'4"-N-50'10"-M
RESISTIVITY LONG NORMAL A-64"-M-65'6"-N-∞-B
RESISTIVITY SHORT NORMAL A-16"- M -18'8" - N - ∞ - B
SPONTANEOUS POTENTIAL

Temperature and mud resistivity observations

1964-06-28 1
Rm = 5.200 Ωm @ 104.000 °F (1739.000 ft)

Change log


97277 2020-06-08 20:57 roakden CLOSED, UNHANDED
97277 2020-06-08 20:55 roakden ADDED RUN 1 (June 28, 1964)
97277 2020-06-08 20:34 roakden EDITED WELL METADATA
97277 2020-06-02 14:01 roakden EDITED WELL METADATA
97277 2020-06-02 13:51 roakden TAKEN
97277 2020-04-06 10:44 tsowers TASK CREATED

Well versions and related tasks

Well 05301129