Well construction data was imported from SharePoint, and may conflict with what was already in this database. Look for change log entries with CONFLICT and resolve each conflict. Make a note in the change log if there is an interesting reason for the conflict.
This task is closed and unheld.
Name | |
Spud date | 2010-06-02 |
Abandon date | |
Borehole orientation | Directional |
Measured depth | 907.000 |
True vertical depth | 888.610 |
Tperf | 612.000 |
Bperf | 712.000 |
Water geochem | |
No well data | |
Glog unavailable | True |
Notes | Active well; Both production and injection |
Service company | Baker Hughes |
Tool | GAMMA RAY - CCL LOG |
Date | 2010-07-27 |
Run number | one |
Driller depth | 878.000 |
Logger depth | 878.000 |
Log bottom | 878.000 |
Log top | 0.000 |
Casing size | 5.500 |
Bit size | |
Mud type | |
Mud density | |
Mud visc (plastic) | |
Mud visc (funnel) | |
Mud ph | |
Mud fluid loss | |
Sample source | |
Circulation stopped time | |
Logger on bottom time | |
Time since circulation | |
Operating rig time | |
Notes |
10454 | 2017-11-29 16:40 | ashley | CLOSED, UNHANDED |
10454 | 2017-11-29 16:39 | ashley | EDITED WELL METADATA |
10454 | 2017-11-29 16:39 | ashley | EDITED RUN one (July 27, 2010) |
10454 | 2017-11-29 16:39 | ashley | EDITED WELL METADATA |
10454 | 2017-11-29 16:33 | ashley | TAKEN |
10454 | 2017-11-29 08:38 | whdc | TASK CREATED |
9999 | 2017-10-26 15:32 | SHAREPOINT IMPORT (mu2) spud_date,tperf,measured_depth,water_geochem,borehole_orientation,notes | |
9999 | 2017-10-26 15:32 | TASK CREATED | |
4100 | 2017-10-20 09:02 | francisco | CLOSED, UNHANDED |
4100 | 2017-10-20 09:02 | francisco | ADDED RUN one (July 27, 2010) |
4100 | 2017-10-20 09:01 | francisco | TAKEN |
4100 | 2017-10-02 11:18 | mloustale | TASK CREATED |
9999 | 2016-12-26 23:53 | ashley | CHECKED WELL METADATA (SHAREPOINT) |
9999 | 2016-12-26 23:53 | hannaho | EDITED WELL METADATA (SHAREPOINT) |
Well 08322606