Name | |
Spud date | 1995-12-08 |
Abandon date | |
Borehole orientation | Directional |
Measured depth | 3480.000 |
True vertical depth | |
Tperf | 2961.000 |
Bperf | 3463.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | HALLIBURTON | HALLIBURTON | SCHLUMBERGER |
Tool | HIGH RESOLUTION INDUCTION 5 INCH LINEAR | COMPENSATED DENSITY DUAL SPACED NEUTRON 5 INCH LINEAR | PLATFORM EXPRESS ARRAY INDUCTION/SP/GR |
Date | 1995-12-12 | 1995-12-12 | 1997-10-17 |
Run number | ONE | ONE | ONE |
Driller depth | 3480.000 | 3480.000 | 3625.000 |
Logger depth | 3481.000 | 3481.000 | 3623.000 |
Log bottom | 3472.000 | 1338.000 | 3615.000 |
Log top | 0.000 | 0.000 | 2790.000 |
Casing size | 9.625 | 9.625 | 7.000 |
Bit size | 8.750 | 8.750 | 6.125 |
Mud type | CLAY BASE | CLAY BASE | PERFLOW |
Mud density | 9.60 | 9.60 | 10.50 |
Mud visc (plastic) | 48.00 | 48.00 | |
Mud visc (funnel) | 45.00 | ||
Mud ph | 10.10 | 10.10 | 8.50 |
Mud fluid loss | 5.80 | 5.30 | 4.80 |
Sample source | FLOWLINE | FLOWLINE | FLOWLINE |
Circulation stopped time | 09:00:00 | ||
Logger on bottom time | 05:00:00 | 05:00:00 | 15:00:00 |
Time since circulation | 4.000 | 4.000 | |
Operating rig time | |||
Notes | FLUID LOSS IN C3 |
86145 | 2019-07-08 14:36 | sgainer | CLOSED, UNHANDED |
86145 | 2019-07-08 14:36 | sgainer | EDITED RUN ONE (Oct. 17, 1997) |
86145 | 2019-07-08 14:35 | sgainer | ADDED RUN ONE (Oct. 17, 1997) |
86145 | 2019-07-08 14:32 | sgainer | EDITED RUN ONE (Dec. 12, 1995) |
86145 | 2019-07-08 14:31 | sgainer | ADDED RUN ONE (Dec. 12, 1995) |
86145 | 2019-07-08 14:30 | sgainer | EDITED RUN ONE (Dec. 12, 1995) |
86145 | 2019-07-08 14:29 | sgainer | ADDED RUN ONE (Dec. 12, 1995) |
86145 | 2019-07-08 14:28 | sgainer | EDITED WELL METADATA |
86145 | 2019-07-08 14:21 | sgainer | TAKEN |
86145 | 2019-06-19 12:38 | tsowers | TASK CREATED |
Well 23723836