Well construction data was imported from SharePoint, and may conflict with what was already in this database. Look for change log entries with CONFLICT and resolve each conflict. Make a note in the change log if there is an interesting reason for the conflict.
This task is closed and unheld.
Name | |
Spud date | |
Abandon date | |
Borehole orientation | |
Measured depth | |
True vertical depth | |
Tperf | |
Bperf | |
Water geochem | |
No well data | |
Glog unavailable | |
Notes | No data |
Service company | Lane Wells | Lane Wells |
Tool | Electrolog | ELECTRIC LOG |
Date | 1947-03-28 | 1947-04-04 |
Run number | 1 | 2 |
Driller depth | 2409.000 | 2925.000 |
Logger depth | 2409.000 | 2925.000 |
Log bottom | 2409.000 | 2925.000 |
Log top | 163.000 | 2409.000 |
Casing size | ||
Bit size | 12.000 | 7.875 |
Mud type | NO CIRCULATION | SPOT GEL |
Mud density | ||
Mud visc (plastic) | ||
Mud visc (funnel) | ||
Mud ph | ||
Mud fluid loss | ||
Sample source | ||
Circulation stopped time | ||
Logger on bottom time | ||
Time since circulation | ||
Operating rig time | ||
Notes | no circulation for mud |
11201 | 2017-12-15 12:10 | ashley | CLOSED, UNHANDED |
11201 | 2017-12-15 12:10 | ashley | EDITED RUN 2 (April 4, 1947) |
11201 | 2017-12-15 12:08 | ashley | EDITED RUN 1 (March 28, 1947) |
11201 | 2017-12-15 12:06 | ashley | TAKEN |
11201 | 2017-11-29 08:38 | whdc | TASK CREATED |
10117 | 2017-10-26 15:32 | SHAREPOINT IMPORT (mu2) water_geochem,notes | |
10117 | 2017-10-26 15:32 | TASK CREATED | |
3388 | 2017-10-06 14:24 | hannaho | CLOSED, UNHANDED |
3388 | 2017-10-06 14:24 | hannaho | ADDED RUN 2 (April 4, 1947) |
3388 | 2017-10-06 14:20 | hannaho | ADDED RUN 1 (March 28, 1947) |
3388 | 2017-10-06 14:13 | hannaho | TAKEN |
3388 | 2017-10-02 11:18 | mloustale | TASK CREATED |
10117 | 2017-06-08 00:53 | ashley | CHECKED WELL METADATA (SHAREPOINT) |
10117 | 2017-06-08 00:53 | diana | EDITED WELL METADATA (SHAREPOINT) |
Well 08300106