Well construction data was imported from SharePoint, and may conflict with what was already in this database. Look for change log entries with CONFLICT and resolve each conflict. Make a note in the change log if there is an interesting reason for the conflict.
This task is closed and unheld.
Name | |
Spud date | 2011-04-06 |
Abandon date | |
Borehole orientation | Vertical |
Measured depth | 1093.000 |
True vertical depth | |
Tperf | 966.000 |
Bperf | 1026.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes | Active well; Both production and injection |
Service company | Halliburton |
Tool | HIGH FREQUENCY DIELECTRIC |
Date | 2011-04-09 |
Run number | ONE |
Driller depth | 1093.000 |
Logger depth | 1093.000 |
Log bottom | 1083.000 |
Log top | 387.000 |
Casing size | 9.625 |
Bit size | 8.500 |
Mud type | GEL/DMA |
Mud density | 15.00 |
Mud visc (plastic) | |
Mud visc (funnel) | 52.00 |
Mud ph | 9.10 |
Mud fluid loss | 6.20 |
Sample source | PIT |
Circulation stopped time | |
Logger on bottom time | 09:08:00 |
Time since circulation | 2.500 |
Operating rig time | |
Notes | Fluid loss is in cptm |
10811 | 2017-12-07 11:04 | ashley | CLOSED, UNHANDED |
10811 | 2017-12-07 11:04 | ashley | EDITED RUN ONE (April 9, 2011) |
10811 | 2017-12-07 11:00 | ashley | EDITED WELL METADATA |
10811 | 2017-12-07 10:56 | ashley | TAKEN |
10811 | 2017-11-29 08:38 | whdc | TASK CREATED |
10210 | 2017-10-26 15:32 | SHAREPOINT IMPORT (mu2) spud_date,tperf,measured_depth,water_geochem,borehole_orientation,notes | |
10210 | 2017-10-26 15:32 | TASK CREATED | |
3775 | 2017-10-13 16:40 | eramirez | CLOSED, UNHANDED |
3775 | 2017-10-13 16:40 | eramirez | EDITED RUN ONE (April 9, 2011) |
3775 | 2017-10-13 16:40 | eramirez | ADDED RUN ONE (April 9, 2011) |
3775 | 2017-10-13 16:33 | eramirez | TAKEN |
3775 | 2017-10-02 11:18 | mloustale | TASK CREATED |
10210 | 2017-06-09 00:53 | ashley | CHECKED WELL METADATA (SHAREPOINT) |
10210 | 2017-06-09 00:53 | ellie | EDITED WELL METADATA (SHAREPOINT) |
Well 08322649