Well construction data was imported from SharePoint, and may conflict with what was already in this database. Look for change log entries with CONFLICT and resolve each conflict. Make a note in the change log if there is an interesting reason for the conflict.
This task is closed and unheld.
Name | |
Spud date | |
Abandon date | |
Borehole orientation | |
Measured depth | |
True vertical depth | |
Tperf | |
Bperf | |
Water geochem | |
No well data | |
Glog unavailable | |
Notes | No data |
Service company | Schlumberger |
Tool | PLATFORM EXPRESS ARRAY INDUCTION/SP/GR/MCFL NEUTRON/DENSITY/EPT |
Date | 2011-10-08 |
Run number | ONE |
Driller depth | 1028.000 |
Logger depth | 1025.000 |
Log bottom | 1017.000 |
Log top | 478.000 |
Casing size | 9.625 |
Bit size | 8.625 |
Mud type | GEL/DMA |
Mud density | 9.10 |
Mud visc (plastic) | |
Mud visc (funnel) | 42.00 |
Mud ph | 8.90 |
Mud fluid loss | 6.00 |
Sample source | MUD TANK |
Circulation stopped time | 10:40:00 |
Logger on bottom time | 13:27:00 |
Time since circulation | |
Operating rig time | |
Notes |
10787 | 2017-12-06 15:29 | ashley | CLOSED, UNHANDED |
10787 | 2017-12-06 15:29 | ashley | EDITED RUN ONE (Oct. 8, 2011) |
10787 | 2017-12-06 15:20 | ashley | TAKEN |
10787 | 2017-11-29 08:38 | whdc | TASK CREATED |
10222 | 2017-10-26 15:32 | SHAREPOINT IMPORT (mu2) water_geochem,notes | |
10222 | 2017-10-26 15:32 | TASK CREATED | |
3794 | 2017-10-13 18:57 | eramirez | CLOSED, UNHANDED |
3794 | 2017-10-13 18:51 | eramirez | EDITED RUN ONE (Oct. 8, 2011) |
3794 | 2017-10-13 18:50 | eramirez | EDITED RUN ONE (Oct. 8, 2011) |
3794 | 2017-10-13 18:50 | eramirez | ADDED RUN ONE (Oct. 8, 2011) |
3794 | 2017-10-13 18:46 | eramirez | TAKEN |
3794 | 2017-10-02 11:18 | mloustale | TASK CREATED |
10222 | 2017-06-09 00:53 | ashley | CHECKED WELL METADATA (SHAREPOINT) |
10222 | 2017-06-09 00:53 | ellie | EDITED WELL METADATA (SHAREPOINT) |
Well 08322690