QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 2009-05-02 |
Abandon date | |
Borehole orientation | Vertical |
Measured depth | 1408.000 |
True vertical depth | |
Tperf | 817.000 |
Bperf | 992.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes | Active well; Both production and injection |
Service company | Halliburton |
Tool | HIGH RESOLUTION SPECTRAL DENSITY DUAL SPACED NEUTRON 2"=100' |
Date | 2009-05-04 |
Run number | ONE |
Driller depth | 1408.000 |
Logger depth | 1398.000 |
Log bottom | 1388.000 |
Log top | 89.000 |
Casing size | 10.750 |
Bit size | 8.750 |
Mud type | LSND |
Mud density | 9.60 |
Mud visc (plastic) | 41.00 |
Mud visc (funnel) | |
Mud ph | 9.20 |
Mud fluid loss | 5.60 |
Sample source | PIT |
Circulation stopped time | |
Logger on bottom time | 00:50:00 |
Time since circulation | 22.000 |
Operating rig time | |
Notes |
10495 | 2017-11-30 14:28 | ashley | CLOSED, UNHANDED |
10495 | 2017-11-30 14:28 | ashley | EDITED RUN ONE (May 4, 2009) |
10495 | 2017-11-30 14:23 | ashley | EDITED WELL METADATA |
10495 | 2017-11-30 14:18 | ashley | TAKEN |
10495 | 2017-11-29 08:38 | whdc | TASK CREATED |
9779 | 2017-10-26 15:32 | SHAREPOINT IMPORT (mu2) spud_date,tperf,measured_depth,water_geochem,borehole_orientation,notes | |
9779 | 2017-10-26 15:32 | TASK CREATED | |
4067 | 2017-10-19 15:45 | ellie | CLOSED, UNHANDED |
4067 | 2017-10-19 15:45 | ellie | EDITED RUN ONE (May 4, 2009) |
4067 | 2017-10-19 15:44 | ellie | ADDED RUN ONE (May 4, 2009) |
4067 | 2017-10-19 15:34 | ellie | TAKEN |
4067 | 2017-10-02 11:18 | mloustale | TASK CREATED |
9779 | 2016-12-22 23:53 | ashley | CHECKED WELL METADATA (SHAREPOINT) |
9779 | 2016-12-22 23:53 | ashley | EDITED WELL METADATA (SHAREPOINT) |
Well 08322560