QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 2012-06-01 |
Abandon date | |
Borehole orientation | Directional |
Measured depth | 984.000 |
True vertical depth | 936.070 |
Tperf | 747.000 |
Bperf | 847.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes | Active well; Both production and injection |
Service company | Schlumberger (Pacific Coast Energy Company LP) |
Tool | PLATFORM EXPRESS TVD ARRAY INDUCTION/SP/GR/MCFL NEUTRON/DENSITY/EPT |
Date | 2012-06-02 |
Run number | ONE |
Driller depth | 984.000 |
Logger depth | 947.000 |
Log bottom | 939.000 |
Log top | 474.000 |
Casing size | 9.625 |
Bit size | 8.625 |
Mud type | GEL/DMA |
Mud density | 8.90 |
Mud visc (plastic) | |
Mud visc (funnel) | 42.00 |
Mud ph | 8.50 |
Mud fluid loss | 5.80 |
Sample source | MUD TANK |
Circulation stopped time | 19:45:00 |
Logger on bottom time | 22:55:00 |
Time since circulation | |
Operating rig time | |
Notes | Fluid loss is in cm^3 |
10721 | 2017-12-01 10:31 | ashley | CLOSED, UNHANDED |
10721 | 2017-12-01 10:31 | ashley | EDITED RUN ONE (June 2, 2012) |
10721 | 2017-12-01 10:26 | ashley | EDITED WELL METADATA |
10721 | 2017-12-01 10:24 | ashley | TAKEN |
10721 | 2017-11-29 08:38 | whdc | TASK CREATED |
9973 | 2017-10-26 15:32 | SHAREPOINT IMPORT (mu2) spud_date,tperf,measured_depth,water_geochem,borehole_orientation,notes | |
9973 | 2017-10-26 15:32 | TASK CREATED | |
3854 | 2017-10-17 15:02 | eramirez | CLOSED, UNHANDED |
3854 | 2017-10-17 15:02 | eramirez | EDITED RUN ONE (June 2, 2012) |
3854 | 2017-10-17 15:01 | eramirez | EDITED RUN ONE (June 2, 2012) |
3854 | 2017-10-17 14:41 | eramirez | ADDED RUN ONE (June 2, 2012) |
3854 | 2017-10-17 14:15 | eramirez | TAKEN |
3854 | 2017-10-02 11:18 | mloustale | TASK CREATED |
9973 | 2016-12-26 23:53 | ashley | CHECKED WELL METADATA (SHAREPOINT) |
9973 | 2016-12-26 23:53 | hannaho | EDITED WELL METADATA (SHAREPOINT) |
Well 08322742