LOG IN / HELP

<<< BACK TO JOB

Orcutt QC: 08320250

QC all data (well construction, run header, g-log curves, mud/temperature).

This task is closed and unheld.

See DOGGR well records.

Well construction

Name
Spud date 1970-04-28
Abandon date 1988-10-12
Borehole orientation Vertical
Measured depth 1250.000
True vertical depth
Tperf 402.000
Bperf 1139.000
Water geochem
No well data
Glog unavailable
Notes

Run headers

Service company Schlumberger
Tool INDUCTION LL-8 AVERAGE
Date 1970-04-30
Run number ONE
Driller depth 1250.000
Logger depth 1250.000
Log bottom 1249.000
Log top 325.000
Casing size 8.625
Bit size 7.875
Mud type CLAY BASE
Mud density
Mud visc (plastic)
Mud visc (funnel)
Mud ph
Mud fluid loss
Sample source FLOWLINE
Circulation stopped time
Logger on bottom time
Time since circulation 1.000
Operating rig time
Notes

G-log curves

1970-04-30 ONE
6FF40 Induction Conductivity
Induction
LL-8 Average
Spontaneous Potential (SP)

Temperature and mud resistivity observations

1970-04-30 ONE
Rm = 1.900 Ωm @ 110.000 °F (MRT, 1250.000 ft)
Rm = 2.940 Ωm @ 70.000 °F
Rmc = 1.600 Ωm @ 70.000 °F
Rmf = 2.870 Ωm @ 60.000 °F

Change log


11000 2017-12-12 14:17 ashley CLOSED, UNHANDED
11000 2017-12-12 14:17 ashley EDITED RUN ONE (April 30, 1970)
11000 2017-12-12 14:14 ashley EDITED WELL METADATA
11000 2017-12-12 14:12 ashley TAKEN
11000 2017-11-29 08:38 whdc TASK CREATED
10037 2017-10-26 15:32 SHAREPOINT IMPORT (mu2) spud_date,abandon_date,tperf,measured_depth,water_geochem,borehole_orientation
10037 2017-10-26 15:32 TASK CREATED
3593 2017-10-10 10:49 hannaho CLOSED, UNHANDED
3593 2017-10-10 10:49 hannaho EDITED RUN ONE (April 30, 1970)
3593 2017-10-10 10:49 hannaho ADDED RUN ONE (April 30, 1970)
3593 2017-10-10 10:41 hannaho TAKEN
3593 2017-10-02 11:18 mloustale TASK CREATED
10037 2017-06-08 00:53 ashley CHECKED WELL METADATA (SHAREPOINT)
10037 2017-06-08 00:53 sharepoint-AG EDITED WELL METADATA (SHAREPOINT)

Well versions and related tasks

Well 08320250