Well construction data was imported from SharePoint, and may conflict with what was already in this database. Look for change log entries with CONFLICT and resolve each conflict. Make a note in the change log if there is an interesting reason for the conflict.
This task is closed and unheld.
Name | |
Spud date | 1982-01-07 |
Abandon date | |
Borehole orientation | |
Measured depth | 850.000 |
True vertical depth | |
Tperf | 600.000 |
Bperf | 850.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes | Water source only; Well abandoned but no info on abandonment |
Service company | Water well surverys |
Tool | ELECTRICAL LOG |
Date | 1982-01-12 |
Run number | One |
Driller depth | 870.000 |
Logger depth | 879.000 |
Log bottom | 850.000 |
Log top | 0.000 |
Casing size | |
Bit size | 12.250 |
Mud type | CLAY BASE |
Mud density | 74.00 |
Mud visc (plastic) | |
Mud visc (funnel) | 31.00 |
Mud ph | |
Mud fluid loss | |
Sample source | SHAKER |
Circulation stopped time | |
Logger on bottom time | |
Time since circulation | 1.000 |
Operating rig time | |
Notes |
11896 | 2018-01-02 15:14 | dakota | CLOSED, UNHANDED |
11896 | 2018-01-02 15:12 | dakota | EDITED WELL METADATA |
11896 | 2018-01-02 15:11 | dakota | TAKEN |
11896 | 2017-12-17 19:39 | whdc | TASK CREATED |
11222 | 2017-12-17 19:31 | SHAREPOINT IMPORT (mu2) spud_date,measured_depth,water_geochem,notes | |
11222 | 2017-12-17 19:31 | TASK CREATED | |
3353 | 2017-10-20 17:13 | eramirez | CLOSED, UNHANDED |
3353 | 2017-10-20 17:13 | eramirez | ADDED RUN One (Jan. 12, 1982) |
3353 | 2017-10-20 17:04 | eramirez | TAKEN |
3353 | 2017-10-02 11:16 | mloustale | TASK CREATED |
11222 | 2017-05-12 00:53 | ashley | CHECKED WELL METADATA (SHAREPOINT) |
11222 | 2017-05-12 00:53 | sharepoint-LR | EDITED WELL METADATA (SHAREPOINT) |
Well 11121661