Well construction data was imported from SharePoint, and may conflict with what was already in this database. Look for change log entries with CONFLICT and resolve each conflict. Make a note in the change log if there is an interesting reason for the conflict.
This task is closed and unheld.
Name | |
Spud date | 1980-09-02 |
Abandon date | |
Borehole orientation | Vertical |
Measured depth | 2475.000 |
True vertical depth | |
Tperf | 2246.000 |
Bperf | 2474.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes | Idle well; Both production and injection |
Service company | Schlumberger |
Tool | DUAL INDUCTION SFL WITH LINEAR CORRELATION LOG |
Date | 1980-09-07 |
Run number | ONE |
Driller depth | 2475.000 |
Logger depth | 2477.000 |
Log bottom | 2471.000 |
Log top | 385.000 |
Casing size | 13.375 |
Bit size | 7.625 |
Mud type | CLAY-BASE |
Mud density | 70.00 |
Mud visc (plastic) | 50.00 |
Mud visc (funnel) | |
Mud ph | 9.00 |
Mud fluid loss | 10.00 |
Sample source | FLOWLINE |
Circulation stopped time | 00:00:00 |
Logger on bottom time | 02:45:00 |
Time since circulation | |
Operating rig time | |
Notes |
11700 | 2018-01-02 10:12 | ashley | CLOSED, UNHANDED |
11700 | 2018-01-02 10:12 | ashley | EDITED RUN ONE (Sept. 7, 1980) |
11700 | 2018-01-02 10:10 | ashley | EDITED WELL METADATA |
11700 | 2018-01-02 10:05 | ashley | TAKEN |
11700 | 2017-12-17 19:39 | whdc | TASK CREATED |
11427 | 2017-12-17 19:31 | SHAREPOINT IMPORT (mu2) spud_date,tperf,measured_depth,water_geochem,notes | |
11427 | 2017-12-17 19:31 | TASK CREATED | |
3207 | 2017-10-29 16:20 | HLoss1 | CLOSED, UNHANDED |
3207 | 2017-10-29 16:20 | HLoss1 | EDITED RUN ONE (Sept. 7, 1980) |
3207 | 2017-10-29 16:18 | HLoss1 | ADDED RUN ONE (Sept. 7, 1980) |
3207 | 2017-10-29 16:16 | HLoss1 | TAKEN |
3207 | 2017-10-02 11:16 | mloustale | TASK CREATED |
11427 | 2017-05-13 00:53 | ashley | CHECKED WELL METADATA (SHAREPOINT) |
11427 | 2017-05-13 00:53 | sharepoint-LR | EDITED WELL METADATA (SHAREPOINT) |
Well 11120989