LOG IN / HELP

<<< BACK TO JOB

Oxnard Sharepoint import: 11101291

Well construction data was imported from SharePoint, and may conflict with what was already in this database. Look for change log entries with CONFLICT and resolve each conflict. Make a note in the change log if there is an interesting reason for the conflict.

This task is closed and unheld.

See DOGGR well records.

Well construction

Name
Spud date 1954-05-02
Abandon date 1976-12-07
Borehole orientation
Measured depth 9700.000
True vertical depth
Tperf 9068.000
Bperf 9380.000
Water geochem
No well data
Glog unavailable
Notes

Run headers

Service company Schlumberger Schlumberger Schlumberger Schlumberger Schlumberger Schlumberger
Tool ELECTRICAL LOG ELECTRICAL LOG ELECTRICAL LOG ELECTRICAL LOG ELECTRICAL LOG INDUCTION-ELECTRICAL LOG
Date 1954-05-04 1954-06-12 1954-06-14 1954-06-21 1954-06-24 1967-09-12
Run number 1 2 3 4 5 ONE
Driller depth 1521.000 8970.000 9079.000 9343.000 9401.000 9700.000
Logger depth 1558.000 8972.000 9081.000 9343.000 9400.000 9701.000
Log bottom 1557.000 8970.000 9080.000 9342.000 9398.000 9696.000
Log top 1487.000 1557.000 8970.000 9080.000 9342.000 8990.000
Casing size 7.000
Bit size 18.625 11.250 11.000 6.125 6.125 6.000
Mud type Clay Base Lime Base Lime Base Oil Emul. Lime Base CLAY BASE
Mud density 84.00 88.00 91.00 97.00 99.00 84.00
Mud visc (plastic) 62.00 65.00 90.00 48.00 58.00 45.00
Mud visc (funnel)
Mud ph 8.00 7.00 7.00 8.50 7.50 12.50
Mud fluid loss 2.50 3.00 3.00 2.80 5.80
Sample source CIRCULATED
Circulation stopped time
Logger on bottom time
Time since circulation 3.000
Operating rig time 1.000 3.250 2.000 2.000 1.750
Notes

G-log curves

1954-05-04 1
AM 16" M
AO 10'
AO 19'
Spontaneous Potential (SP)
1954-06-12 2
AM 16" M
AO 10'
AO 19'
Spontaneous Potential (SP)
1954-06-14 3
AM 16" M
AO 10'
AO 19'
Spontaneous Potential (SP)
1954-06-21 4
AM 16" M
AO 10'
AO 19'
Spontaneous Potential (SP)
1954-06-24 5
AM 16" M
AO 10'
AO 19'
Spontaneous Potential (SP)
1967-09-12 ONE
6FF40 Induction
A-16"-M Short Normal
INDUCTION RESISTIVITY
Spontaneous Potential (SP)

Temperature and mud resistivity observations

1954-05-04 1
Rm = 5.700 Ωm @ 85.000 °F (MRT, 1557.000 ft)
Rm = 6.000 Ωm @ 79.000 °F
1954-06-12 2
Rm = 0.560 Ωm @ 166.000 °F (MRT, 8970.000 ft)
Rm = 1.200 Ωm @ 71.000 °F
1954-06-14 3
Rm = 0.610 Ωm @ 166.000 °F
Rm = 1.100 Ωm @ 78.000 °F
1954-06-21 4
Rm = 0.620 Ωm @ 188.000 °F (MRT, 9342.000 ft)
Rm = 1.500 Ωm @ 68.000 °F
1954-06-24 5
Rm = 0.860 Ωm @ 190.000 °F (MRT, 9398.000 ft)
Rm = 1.860 Ωm @ 76.000 °F
1967-09-12 ONE
Rm = 0.460 Ωm @ 192.000 °F (MRT, 9696.000 ft)
Rm = 1.100 Ωm @ 82.000 °F
Rmc = 2.750 Ωm @ 73.000 °F
Rmf = 0.900 Ωm @ 73.000 °F

Change log


11802 2018-01-02 09:56 dakota CLOSED, UNHANDED
11802 2018-01-02 09:52 dakota EDITED WELL METADATA
11802 2018-01-02 09:51 dakota TAKEN
11802 2017-12-17 19:39 whdc TASK CREATED
11518 2017-12-17 19:31 SHAREPOINT IMPORT (mu2) spud_date,abandon_date,tperf,measured_depth,water_geochem
11518 2017-12-17 19:31 TASK CREATED
3110 2017-10-25 15:43 hannaho CLOSED, UNHANDED
3110 2017-10-25 15:43 hannaho ADDED RUN 5 (June 24, 1954)
3110 2017-10-25 15:41 hannaho ADDED RUN 4 (June 21, 1954)
3110 2017-10-25 15:38 hannaho ADDED RUN 3 (June 14, 1954)
3110 2017-10-25 15:35 hannaho ADDED RUN 2 (June 12, 1954)
3110 2017-10-25 15:20 hannaho ADDED RUN 1 (May 4, 1954)
3110 2017-10-25 15:14 hannaho EDITED RUN ONE (Sept. 12, 1967)
3110 2017-10-25 15:13 hannaho ADDED RUN ONE (Sept. 12, 1967)
3110 2017-10-25 15:03 hannaho TAKEN
3110 2017-10-02 11:16 mloustale TASK CREATED
11518 2017-05-13 00:53 ashley CHECKED WELL METADATA (SHAREPOINT)
11518 2017-05-13 00:53 sharepoint-EF EDITED WELL METADATA (SHAREPOINT)

Well versions and related tasks

Well 11101291