QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 1969-08-11 |
Abandon date | 2001-11-12 |
Borehole orientation | Vertical |
Measured depth | 2100.000 |
True vertical depth | |
Tperf | 1879.000 |
Bperf | 2098.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes | Both production and injection |
Service company | Schlumberger |
Tool | INDUCTION ELECTRICAL LOG |
Date | 1969-08-14 |
Run number | One |
Driller depth | 2160.000 |
Logger depth | 2102.000 |
Log bottom | 2102.000 |
Log top | 252.000 |
Casing size | 12.375 |
Bit size | 12.250 |
Mud type | Clay Base |
Mud density | 72.00 |
Mud visc (plastic) | 45.00 |
Mud visc (funnel) | |
Mud ph | 10.00 |
Mud fluid loss | 9.40 |
Sample source | |
Circulation stopped time | |
Logger on bottom time | |
Time since circulation | 2.000 |
Operating rig time | |
Notes |
11597 | 2017-12-19 10:54 | ashley | CLOSED, UNHANDED |
11597 | 2017-12-19 10:54 | ashley | EDITED RUN One (Aug. 14, 1969) |
11597 | 2017-12-19 10:51 | ashley | EDITED WELL METADATA |
11597 | 2017-12-19 10:46 | ashley | TAKEN |
11597 | 2017-12-17 19:39 | whdc | TASK CREATED |
11442 | 2017-12-17 19:31 | SHAREPOINT IMPORT (mu2) spud_date,abandon_date,tperf,measured_depth,water_geochem,notes | |
11442 | 2017-12-17 19:31 | TASK CREATED | |
3332 | 2017-11-01 10:50 | francisco | CLOSED, UNHANDED |
3332 | 2017-11-01 10:49 | francisco | EDITED RUN One (Aug. 14, 1969) |
3332 | 2017-11-01 10:49 | francisco | ADDED RUN One (Aug. 14, 1969) |
3332 | 2017-11-01 10:47 | francisco | TAKEN |
3332 | 2017-10-02 11:16 | mloustale | TASK CREATED |
11442 | 2017-05-13 00:53 | ashley | CHECKED WELL METADATA (SHAREPOINT) |
11442 | 2017-05-13 00:53 | sharepoint-LR | EDITED WELL METADATA (SHAREPOINT) |
Well 11120182