QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 1980-09-23 |
Abandon date | |
Borehole orientation | |
Measured depth | 2144.000 |
True vertical depth | |
Tperf | 1765.000 |
Bperf | 2144.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes | Idle well; Both production and injection; Top perf is 1765' but well hasn't produced at this depth |
Service company | Schlumberger |
Tool | 2" DUAL INDUCTION/SFL |
Date | 1980-09-27 |
Run number | one |
Driller depth | 2144.000 |
Logger depth | 2142.000 |
Log bottom | 2136.000 |
Log top | 431.000 |
Casing size | |
Bit size | 9.675 |
Mud type | Clay Base |
Mud density | 70.00 |
Mud visc (plastic) | 42.00 |
Mud visc (funnel) | |
Mud ph | 8.50 |
Mud fluid loss | 9.80 |
Sample source | PIT |
Circulation stopped time | 11:00:00 |
Logger on bottom time | 13:00:00 |
Time since circulation | |
Operating rig time | |
Notes |
11744 | 2018-01-02 13:41 | dakota | CLOSED, UNHANDED |
11744 | 2018-01-02 13:40 | dakota | EDITED WELL METADATA |
11744 | 2018-01-02 13:38 | dakota | TAKEN |
11744 | 2017-12-17 19:39 | whdc | TASK CREATED |
11423 | 2017-12-17 19:31 | SHAREPOINT IMPORT (mu2) spud_date,tperf,measured_depth,water_geochem,notes | |
11423 | 2017-12-17 19:31 | TASK CREATED | |
3211 | 2017-10-27 11:37 | fatimaburhan | CLOSED, UNHANDED |
3211 | 2017-10-27 11:37 | fatimaburhan | EDITED RUN one (Sept. 27, 1980) |
3211 | 2017-10-27 11:37 | fatimaburhan | EDITED RUN one (Sept. 27, 1980) |
3211 | 2017-10-27 11:29 | fatimaburhan | ADDED RUN one (Sept. 27, 1980) |
3211 | 2017-10-27 11:25 | fatimaburhan | TAKEN |
3211 | 2017-10-02 11:16 | mloustale | TASK CREATED |
11423 | 2017-05-13 00:53 | ashley | CHECKED WELL METADATA (SHAREPOINT) |
11423 | 2017-05-13 00:53 | sharepoint-LR | EDITED WELL METADATA (SHAREPOINT) |
Well 11121008