(1) Add well metadata and log curve descriptions.
(2) QC run headers for SP and resistivity curves.
— Make sure runs account for the total length of the well.
— When a mud resistivity measurement is at BHT, enter bottom hole depth for it.
– Run headers often continue off to the right, where there are extra mud resistivity measurements (example: 02984218).
This task is closed and unheld.
Name | |
Spud date | 2011-09-26 |
Abandon date | |
Borehole orientation | Directional |
Measured depth | 2563.000 |
True vertical depth | |
Tperf | |
Bperf | |
Water geochem | |
No well data | |
Glog unavailable | |
Notes | NO PERF DATA |
Service company | Schlumberger |
Tool | PLATFORM EXPRESS ARRAY INDUCTION/SP/GR DENSITY/NEUTRON/EPT |
Date | 2011-09-29 |
Run number | ONE |
Driller depth | 2563.000 |
Logger depth | 2564.000 |
Log bottom | 2556.000 |
Log top | 60.000 |
Casing size | 10.750 |
Bit size | 9.875 |
Mud type | Low PH Gel/Poly Pac |
Mud density | 10.90 |
Mud visc (plastic) | |
Mud visc (funnel) | 47.00 |
Mud ph | 7.60 |
Mud fluid loss | 5.50 |
Sample source | MUD PIT |
Circulation stopped time | 03:00:00 |
Logger on bottom time | 06:11:00 |
Time since circulation | |
Operating rig time | |
Notes |
1455 | 2017-08-09 14:55 | dakota | CLOSED, UNHANDED |
1455 | 2017-08-09 14:53 | dakota | EDITED RUN ONE (Sept. 29, 2011) |
1455 | 2017-08-09 14:53 | dakota | EDITED RUN ONE (Sept. 29, 2011) |
1455 | 2017-08-09 14:52 | dakota | EDITED RUN ONE (Sept. 29, 2011) |
1455 | 2017-08-09 14:49 | dakota | EDITED WELL METADATA |
1455 | 2017-08-09 14:47 | dakota | TAKEN |
1455 | 2017-08-02 16:45 | whdc | TASK CREATED |
1161 | 2017-06-28 12:35 | dakota | CLOSED, UNHANDED |
1161 | 2017-06-28 12:35 | dakota | EDITED RUN ONE (Sept. 29, 2011) |
1161 | 2017-06-28 12:34 | dakota | ADDED RUN ONE (Sept. 29, 2011) |
1161 | 2017-06-28 12:31 | dakota | TAKEN |
1161 | 2017-06-24 13:48 | whdc | TASK CREATED |
Well 03044699