(1) Add well metadata and log curve descriptions.
(2) QC run headers for SP and resistivity curves.
— Make sure runs account for the total length of the well.
— When a mud resistivity measurement is at BHT, enter bottom hole depth for it.
– Run headers often continue off to the right, where there are extra mud resistivity measurements (example: 02984218).
This task is closed and unheld.
Name | |
Spud date | 2010-12-02 |
Abandon date | |
Borehole orientation | Vertical |
Measured depth | 2894.000 |
True vertical depth | |
Tperf | 1671.000 |
Bperf | 2318.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | Schlumberger |
Tool | PLATFORM EXPRESS ARRAY INDUCTION/SP/GR DENSITY/NEUTRON/ADT |
Date | 2010-12-05 |
Run number | one |
Driller depth | 2894.000 |
Logger depth | 2897.000 |
Log bottom | 2889.000 |
Log top | 50.000 |
Casing size | 10.750 |
Bit size | 9.875 |
Mud type | LSND |
Mud density | 10.35 |
Mud visc (plastic) | 57.00 |
Mud visc (funnel) | |
Mud ph | 7.10 |
Mud fluid loss | 3.00 |
Sample source | FLOWLINE |
Circulation stopped time | 06:00:00 |
Logger on bottom time | 11:20:00 |
Time since circulation | |
Operating rig time | |
Notes |
1526 | 2017-08-10 13:11 | dakota | CLOSED, UNHANDED |
1526 | 2017-08-10 13:10 | dakota | EDITED RUN one (Dec. 5, 2010) |
1526 | 2017-08-10 13:10 | dakota | EDITED RUN one (Dec. 5, 2010) |
1526 | 2017-08-10 13:08 | dakota | EDITED RUN one (Dec. 5, 2010) |
1526 | 2017-08-10 13:06 | dakota | EDITED WELL METADATA |
1526 | 2017-08-10 13:04 | dakota | TAKEN |
1526 | 2017-08-02 16:45 | whdc | TASK CREATED |
1090 | 2017-06-27 12:37 | dakota | CLOSED, UNHANDED |
1090 | 2017-06-27 12:37 | dakota | EDITED RUN one (Dec. 5, 2010) |
1090 | 2017-06-27 12:36 | dakota | ADDED RUN one (Dec. 5, 2010) |
1090 | 2017-06-27 12:33 | dakota | TAKEN |
1090 | 2017-06-24 13:48 | whdc | TASK CREATED |
Well 03041185