(1) Add well metadata and log curve descriptions.
(2) QC run headers for SP and resistivity curves.
— Make sure runs account for the total length of the well.
— When a mud resistivity measurement is at BHT, enter bottom hole depth for it.
– Run headers often continue off to the right, where there are extra mud resistivity measurements (example: 02984218).
This task is closed and unheld.
Name | |
Spud date | 2010-10-25 |
Abandon date | |
Borehole orientation | Directional |
Measured depth | 2931.000 |
True vertical depth | |
Tperf | 1388.000 |
Bperf | 2449.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | Schlumberger |
Tool | PLATFORM EXPRESS ARRAY INDUCTION/SP/GR/NEUTRON/DENSITY/MCFL |
Date | 2010-10-28 |
Run number | ONE |
Driller depth | 2931.000 |
Logger depth | 2882.000 |
Log bottom | 2874.000 |
Log top | 50.000 |
Casing size | 10.750 |
Bit size | 9.875 |
Mud type | GEL/SP101 |
Mud density | 9.20 |
Mud visc (plastic) | 48.00 |
Mud visc (funnel) | |
Mud ph | 6.40 |
Mud fluid loss | 4.90 |
Sample source | MUD TANK |
Circulation stopped time | 10:00:00 |
Logger on bottom time | 14:00:00 |
Time since circulation | |
Operating rig time | |
Notes |
1535 | 2017-08-10 12:02 | dakota | CLOSED, UNHANDED |
1535 | 2017-08-10 12:01 | dakota | EDITED RUN ONE (Oct. 28, 2010) |
1535 | 2017-08-10 12:01 | dakota | EDITED RUN ONE (Oct. 28, 2010) |
1535 | 2017-08-10 12:01 | dakota | EDITED RUN ONE (Oct. 28, 2010) |
1535 | 2017-08-10 11:58 | dakota | EDITED WELL METADATA |
1535 | 2017-08-10 11:56 | dakota | TAKEN |
1535 | 2017-08-02 16:45 | whdc | TASK CREATED |
1081 | 2017-06-27 12:15 | dakota | CLOSED, UNHANDED |
1081 | 2017-06-27 12:15 | dakota | EDITED RUN ONE (Oct. 28, 2010) |
1081 | 2017-06-27 12:14 | dakota | ADDED RUN ONE (Oct. 28, 2010) |
1081 | 2017-06-27 12:02 | dakota | TAKEN |
1081 | 2017-06-24 13:48 | whdc | TASK CREATED |
Well 03041051