(1) Add well metadata and log curve descriptions.
(2) QC run headers for SP and resistivity curves.
— Make sure runs account for the total length of the well.
— When a mud resistivity measurement is at BHT, enter bottom hole depth for it.
– Run headers often continue off to the right, where there are extra mud resistivity measurements (example: 02984218).
This task is closed and unheld.
Name | |
Spud date | 2009-03-20 |
Abandon date | |
Borehole orientation | Directional |
Measured depth | 2884.000 |
True vertical depth | 2883.400 |
Tperf | 1910.000 |
Bperf | 2660.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | Schlumberger |
Tool | TRIPLE COMBO AIT/TLD/HGNS |
Date | 2009-03-22 |
Run number | ONE |
Driller depth | 2875.000 |
Logger depth | 2871.000 |
Log bottom | 2863.000 |
Log top | 205.000 |
Casing size | 9.625 |
Bit size | 8.750 |
Mud type | GEL/CYPAN |
Mud density | 9.80 |
Mud visc (plastic) | 40.00 |
Mud visc (funnel) | |
Mud ph | 7.80 |
Mud fluid loss | 5.80 |
Sample source | MUD TANK |
Circulation stopped time | 07:00:00 |
Logger on bottom time | 11:05:00 |
Time since circulation | |
Operating rig time | |
Notes |
1587 | 2017-08-10 16:46 | ashley | CLOSED, UNHANDED |
1587 | 2017-08-10 16:46 | ashley | EDITED RUN ONE (March 22, 2009) |
1587 | 2017-08-10 16:44 | ashley | EDITED RUN ONE (March 22, 2009) |
1587 | 2017-08-10 16:42 | ashley | EDITED RUN ONE (March 22, 2009) |
1587 | 2017-08-10 16:40 | ashley | EDITED RUN ONE (March 22, 2009) |
1587 | 2017-08-10 16:38 | ashley | EDITED WELL METADATA |
1587 | 2017-08-10 16:34 | ashley | TAKEN |
1587 | 2017-08-02 16:45 | whdc | TASK CREATED |
1029 | 2017-06-27 09:50 | dakota | CLOSED, UNHANDED |
1029 | 2017-06-27 09:50 | dakota | EDITED RUN ONE (March 22, 2009) |
1029 | 2017-06-27 09:49 | dakota | ADDED RUN ONE (March 22, 2009) |
1029 | 2017-06-27 09:48 | dakota | TAKEN |
1029 | 2017-06-24 13:48 | whdc | TASK CREATED |
Well 03038365