(1) Add well metadata and log curve descriptions.
(2) QC run headers for SP and resistivity curves.
— Make sure runs account for the total length of the well.
— When a mud resistivity measurement is at BHT, enter bottom hole depth for it.
– Run headers often continue off to the right, where there are extra mud resistivity measurements (example: 02984218).
This task is closed and unheld.
Name | |
Spud date | 2008-05-14 |
Abandon date | |
Borehole orientation | Directional |
Measured depth | 2595.000 |
True vertical depth | 2593.000 |
Tperf | 1645.000 |
Bperf | 2589.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company |
Tool |
Date |
Run number |
Driller depth |
Logger depth |
Log bottom |
Log top |
Casing size |
Bit size |
Mud type |
Mud density |
Mud visc (plastic) |
Mud visc (funnel) |
Mud ph |
Mud fluid loss |
Sample source |
Circulation stopped time |
Logger on bottom time |
Time since circulation |
Operating rig time |
Notes |
1601 | 2017-08-10 13:34 | ashley | CLOSED, UNHANDED |
1601 | 2017-08-10 13:34 | ashley | EDITED WELL METADATA |
1601 | 2017-08-10 13:30 | ashley | TAKEN |
1601 | 2017-08-02 16:45 | whdc | TASK CREATED |
1015 | 2017-06-27 09:22 | dakota | CLOSED, UNHANDED |
1015 | 2017-06-27 09:22 | dakota | NO GLOGS |
1015 | 2017-06-27 09:22 | dakota | TAKEN |
1015 | 2017-06-24 13:48 | whdc | TASK CREATED |
Well 03034851