(1) Add well metadata and log curve descriptions.
(2) QC run headers for SP and resistivity curves.
— Make sure runs account for the total length of the well.
— When a mud resistivity measurement is at BHT, enter bottom hole depth for it.
– Run headers often continue off to the right, where there are extra mud resistivity measurements (example: 02984218).
This task is closed and unheld.
Name | |
Spud date | 2007-11-12 |
Abandon date | |
Borehole orientation | Vertical |
Measured depth | 2397.000 |
True vertical depth | |
Tperf | |
Bperf | |
Water geochem | |
No well data | |
Glog unavailable | |
Notes | Injection only |
Service company | Schlumberger |
Tool | PLATFORM EXPRESS ARRAY INDUCTION/NEUTRON/DENSITY GR/ SP |
Date | 2007-11-18 |
Run number | 1 |
Driller depth | 2397.000 |
Logger depth | 2280.000 |
Log bottom | 2272.000 |
Log top | 95.000 |
Casing size | 8.625 |
Bit size | 7.875 |
Mud type | PAC-L/QUICK-GEL |
Mud density | 9.30 |
Mud visc (plastic) | 56.00 |
Mud visc (funnel) | |
Mud ph | 8.40 |
Mud fluid loss | 5.00 |
Sample source | MUD PIT |
Circulation stopped time | 05:30:00 |
Logger on bottom time | 12:30:00 |
Time since circulation | |
Operating rig time | |
Notes |
1629 | 2017-08-11 14:23 | ashley | CLOSED, UNHANDED |
1629 | 2017-08-11 14:23 | ashley | EDITED RUN 1 (Nov. 18, 2007) |
1629 | 2017-08-11 14:22 | ashley | EDITED RUN 1 (Nov. 18, 2007) |
1629 | 2017-08-11 14:20 | ashley | EDITED RUN 1 (Nov. 18, 2007) |
1629 | 2017-08-11 14:18 | ashley | EDITED WELL METADATA |
1629 | 2017-08-11 14:14 | ashley | TAKEN |
1629 | 2017-08-02 16:45 | whdc | TASK CREATED |
987 | 2017-06-26 13:35 | dakota | CLOSED, UNHANDED |
987 | 2017-06-26 13:35 | dakota | EDITED RUN 1 (Nov. 18, 2007) |
987 | 2017-06-26 13:35 | dakota | ADDED RUN 1 (Nov. 18, 2007) |
987 | 2017-06-26 13:33 | dakota | TAKEN |
987 | 2017-06-24 13:48 | whdc | TASK CREATED |
Well 03033476