(1) Add well metadata and log curve descriptions.
(2) QC run headers for SP and resistivity curves.
— Make sure runs account for the total length of the well.
— When a mud resistivity measurement is at BHT, enter bottom hole depth for it.
– Run headers often continue off to the right, where there are extra mud resistivity measurements (example: 02984218).
This task is closed and unheld.
Name | |
Spud date | 2007-06-27 |
Abandon date | 2014-07-22 |
Borehole orientation | Directional |
Measured depth | 2512.000 |
True vertical depth | 2511.000 |
Tperf | |
Bperf | |
Water geochem | |
No well data | |
Glog unavailable | |
Notes | Injection only |
Service company |
Tool |
Date |
Run number |
Driller depth |
Logger depth |
Log bottom |
Log top |
Casing size |
Bit size |
Mud type |
Mud density |
Mud visc (plastic) |
Mud visc (funnel) |
Mud ph |
Mud fluid loss |
Sample source |
Circulation stopped time |
Logger on bottom time |
Time since circulation |
Operating rig time |
Notes |
1630 | 2017-08-11 14:52 | ashley | CLOSED, UNHANDED |
1630 | 2017-08-11 14:52 | ashley | EDITED WELL METADATA |
1630 | 2017-08-11 14:45 | ashley | TAKEN |
1630 | 2017-08-02 16:45 | whdc | TASK CREATED |
986 | 2017-06-26 13:33 | dakota | CLOSED, UNHANDED |
986 | 2017-06-26 13:33 | dakota | NO GLOGS |
986 | 2017-06-26 13:33 | dakota | TAKEN |
986 | 2017-06-24 13:48 | whdc | TASK CREATED |
Well 03033307