(1) Add well metadata and log curve descriptions.
(2) QC run headers for SP and resistivity curves.
— Make sure runs account for the total length of the well.
— When a mud resistivity measurement is at BHT, enter bottom hole depth for it.
– Run headers often continue off to the right, where there are extra mud resistivity measurements (example: 02984218).
This task is closed and unheld.
Name | |
Spud date | 2007-08-29 |
Abandon date | |
Borehole orientation | Directional |
Measured depth | 2468.000 |
True vertical depth | |
Tperf | |
Bperf | |
Water geochem | |
No well data | |
Glog unavailable | |
Notes | Injection only |
Service company | Schlumberger |
Tool | PLATFORM EXPRESS INDUCTION/MCFL/SP/DENSITY/NEUTRON/GR |
Date | 2007-08-31 |
Run number | ONE |
Driller depth | 2478.000 |
Logger depth | |
Log bottom | 2400.000 |
Log top | 94.000 |
Casing size | 8.625 |
Bit size | 7.875 |
Mud type | QUIKGEL |
Mud density | 9.25 |
Mud visc (plastic) | 40.00 |
Mud visc (funnel) | |
Mud ph | 7.00 |
Mud fluid loss | 6.50 |
Sample source | MUD PIT |
Circulation stopped time | 09:30:00 |
Logger on bottom time | 13:00:00 |
Time since circulation | |
Operating rig time | |
Notes |
1638 | 2017-08-11 15:16 | ashley | CLOSED, UNHANDED |
1638 | 2017-08-11 15:14 | ashley | EDITED RUN ONE (Aug. 31, 2007) |
1638 | 2017-08-11 15:14 | ashley | EDITED RUN ONE (Aug. 31, 2007) |
1638 | 2017-08-11 15:12 | ashley | EDITED RUN ONE (Aug. 31, 2007) |
1638 | 2017-08-11 15:10 | ashley | EDITED RUN ONE (Aug. 31, 2007) |
1638 | 2017-08-11 15:05 | ashley | EDITED WELL METADATA |
1638 | 2017-08-11 15:02 | ashley | TAKEN |
1638 | 2017-08-02 16:45 | whdc | TASK CREATED |
978 | 2017-06-26 13:08 | dakota | CLOSED, UNHANDED |
978 | 2017-06-26 13:05 | dakota | EDITED RUN ONE (Aug. 31, 2007) |
978 | 2017-06-26 13:05 | dakota | ADDED RUN ONE (Aug. 31, 2007) |
978 | 2017-06-26 13:03 | dakota | TAKEN |
978 | 2017-06-24 13:48 | whdc | TASK CREATED |
Well 03032543