(1) Add well metadata and log curve descriptions.
(2) QC run headers for SP and resistivity curves.
— Make sure runs account for the total length of the well.
— When a mud resistivity measurement is at BHT, enter bottom hole depth for it.
– Run headers often continue off to the right, where there are extra mud resistivity measurements (example: 02984218).
This task is closed and unheld.
Name | |
Spud date | |
Abandon date | |
Borehole orientation | Directional |
Measured depth | 2388.000 |
True vertical depth | |
Tperf | |
Bperf | |
Water geochem | |
No well data | |
Glog unavailable | |
Notes | Data missing |
Service company | Schlumberger |
Tool | PLATFORM EXPRESS ARRAY INDUCTION/GR/SP DENSITY/NEUTRON/MCFL |
Date | 2005-01-27 |
Run number | ONE |
Driller depth | 2783.000 |
Logger depth | 2786.000 |
Log bottom | 2778.000 |
Log top | 813.000 |
Casing size | 10.750 |
Bit size | 9.875 |
Mud type | LSND |
Mud density | 10.40 |
Mud visc (plastic) | 44.00 |
Mud visc (funnel) | |
Mud ph | 8.00 |
Mud fluid loss | 7.80 |
Sample source | FLOWLINE |
Circulation stopped time | 09:15:00 |
Logger on bottom time | 12:25:00 |
Time since circulation | |
Operating rig time | |
Notes |
1661 | 2017-08-14 11:30 | hannaho | CLOSED, UNHANDED |
1661 | 2017-08-14 11:30 | hannaho | EDITED RUN ONE (Jan. 27, 2005) |
1661 | 2017-08-14 11:29 | hannaho | EDITED RUN ONE (Jan. 27, 2005) |
1661 | 2017-08-14 11:27 | hannaho | EDITED WELL METADATA |
1661 | 2017-08-14 11:21 | hannaho | TAKEN |
1661 | 2017-08-02 16:45 | whdc | TASK CREATED |
955 | 2017-06-26 12:34 | dakota | CLOSED, UNHANDED |
955 | 2017-06-26 12:33 | dakota | EDITED RUN ONE (Jan. 27, 2005) |
955 | 2017-06-26 12:33 | dakota | ADDED RUN ONE (Jan. 27, 2005) |
955 | 2017-06-26 12:31 | dakota | TAKEN |
955 | 2017-06-24 13:48 | whdc | TASK CREATED |
Well 03026043