(1) Add well metadata and log curve descriptions.
(2) QC run headers for SP and resistivity curves.
— Make sure runs account for the total length of the well.
— When a mud resistivity measurement is at BHT, enter bottom hole depth for it.
– Run headers often continue off to the right, where there are extra mud resistivity measurements (example: 02984218).
This task is closed and unheld.
Name | |
Spud date | 2003-02-06 |
Abandon date | |
Borehole orientation | Directional |
Measured depth | 2359.000 |
True vertical depth | 2425.000 |
Tperf | 2046.000 |
Bperf | 2054.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | Schlumberger |
Tool | PLATFORM EXPRESS ARRAY INDUCTION/SP/GR/NEUTRON/DENSITY/MCFL/HSTS |
Date | 2003-02-08 |
Run number | ONE |
Driller depth | 2425.000 |
Logger depth | 2248.000 |
Log bottom | 2238.000 |
Log top | 328.000 |
Casing size | 10.750 |
Bit size | 9.875 |
Mud type | GEL/CYPAN |
Mud density | 10.60 |
Mud visc (plastic) | 50.00 |
Mud visc (funnel) | |
Mud ph | 6.40 |
Mud fluid loss | 4.60 |
Sample source | CIRC PIT |
Circulation stopped time | 14:30:00 |
Logger on bottom time | 17:30:00 |
Time since circulation | |
Operating rig time | |
Notes |
1674 | 2017-08-14 11:24 | dakota | CLOSED, UNHANDED |
1674 | 2017-08-14 11:24 | dakota | EDITED RUN ONE (Feb. 8, 2003) |
1674 | 2017-08-14 11:23 | dakota | EDITED RUN ONE (Feb. 8, 2003) |
1674 | 2017-08-14 11:21 | dakota | EDITED WELL METADATA |
1674 | 2017-08-14 11:17 | dakota | TAKEN |
1674 | 2017-08-02 16:45 | whdc | TASK CREATED |
942 | 2017-06-26 11:47 | dakota | CLOSED, UNHANDED |
942 | 2017-06-26 11:47 | dakota | EDITED RUN ONE (Feb. 8, 2003) |
942 | 2017-06-26 11:47 | dakota | ADDED RUN ONE (Feb. 8, 2003) |
942 | 2017-06-26 11:42 | dakota | TAKEN |
942 | 2017-06-24 13:48 | whdc | TASK CREATED |
Well 03021137