(1) Add well metadata and log curve descriptions.
(2) QC run headers for SP and resistivity curves.
— Make sure runs account for the total length of the well.
— When a mud resistivity measurement is at BHT, enter bottom hole depth for it.
– Run headers often continue off to the right, where there are extra mud resistivity measurements (example: 02984218).
This task is closed and unheld.
Name | |
Spud date | 1999-05-24 |
Abandon date | |
Borehole orientation | Vertical |
Measured depth | 2336.000 |
True vertical depth | 2400.000 |
Tperf | |
Bperf | |
Water geochem | |
No well data | |
Glog unavailable | |
Notes | NO PERF DATA |
Service company | Schlumberger |
Tool | PLATFORM EXPRESS ARRAY INDUCTION TOOL/SP/GR DENSITY/NEUTRON/MCFL/EPT |
Date | 1999-05-27 |
Run number | ONE |
Driller depth | 2400.000 |
Logger depth | 2370.000 |
Log bottom | 2362.000 |
Log top | 80.000 |
Casing size | 10.750 |
Bit size | 9.875 |
Mud type | GEL |
Mud density | 9.00 |
Mud visc (plastic) | 42.00 |
Mud visc (funnel) | |
Mud ph | |
Mud fluid loss | |
Sample source | FLOWLINE |
Circulation stopped time | 03:30:00 |
Logger on bottom time | 07:00:00 |
Time since circulation | |
Operating rig time | |
Notes |
1675 | 2017-08-14 11:15 | dakota | CLOSED, UNHANDED |
1675 | 2017-08-14 11:15 | dakota | EDITED WELL METADATA |
1675 | 2017-08-14 11:14 | dakota | EDITED RUN ONE (May 27, 1999) |
1675 | 2017-08-14 11:14 | dakota | EDITED RUN ONE (May 27, 1999) |
1675 | 2017-08-14 11:12 | dakota | EDITED WELL METADATA |
1675 | 2017-08-14 11:08 | dakota | TAKEN |
1675 | 2017-08-02 16:45 | whdc | TASK CREATED |
941 | 2017-06-26 11:42 | dakota | CLOSED, UNHANDED |
941 | 2017-06-26 11:41 | dakota | EDITED RUN ONE (May 27, 1999) |
941 | 2017-06-26 11:41 | dakota | EDITED RUN ONE (May 27, 1999) |
941 | 2017-06-26 11:41 | dakota | ADDED RUN ONE (May 27, 1999) |
941 | 2017-06-26 11:38 | dakota | TAKEN |
941 | 2017-06-24 13:48 | whdc | TASK CREATED |
Well 03013421