(1) Add well metadata and log curve descriptions.
(2) QC run headers for SP and resistivity curves.
— Make sure runs account for the total length of the well.
— When a mud resistivity measurement is at BHT, enter bottom hole depth for it.
– Run headers often continue off to the right, where there are extra mud resistivity measurements (example: 02984218).
This task is closed and unheld.
Name | |
Spud date | 1998-02-11 |
Abandon date | 2013-09-03 |
Borehole orientation | Directional |
Measured depth | 2537.000 |
True vertical depth | 2532.900 |
Tperf | |
Bperf | |
Water geochem | |
No well data | |
Glog unavailable | |
Notes | Injection only |
Service company | Halliburton |
Tool | HIGH RESOLUTION IND COMPENSATED DENSITY DUAL SPACED NEUTRON |
Date | 1998-02-12 |
Run number | ONe |
Driller depth | 504.000 |
Logger depth | 504.000 |
Log bottom | 495.000 |
Log top | 48.000 |
Casing size | 14.000 |
Bit size | 11.000 |
Mud type | GEL/SP101 |
Mud density | 8.70 |
Mud visc (plastic) | 42.00 |
Mud visc (funnel) | |
Mud ph | 10.60 |
Mud fluid loss | 20.00 |
Sample source | CIRCULATED |
Circulation stopped time | |
Logger on bottom time | 10:30:00 |
Time since circulation | 1.500 |
Operating rig time | |
Notes |
1677 | 2017-08-11 17:29 | ashley | CLOSED, UNHANDED |
1677 | 2017-08-11 17:28 | ashley | EDITED RUN ONe (Feb. 12, 1998) |
1677 | 2017-08-11 17:28 | ashley | EDITED RUN ONe (Feb. 12, 1998) |
1677 | 2017-08-11 17:26 | ashley | EDITED RUN ONe (Feb. 12, 1998) |
1677 | 2017-08-11 17:25 | ashley | EDITED RUN ONe (Feb. 12, 1998) |
1677 | 2017-08-11 17:23 | ashley | EDITED WELL METADATA |
1677 | 2017-08-11 17:19 | ashley | TAKEN |
1677 | 2017-08-02 16:45 | whdc | TASK CREATED |
939 | 2017-06-26 11:24 | dakota | CLOSED, UNHANDED |
939 | 2017-06-26 11:24 | dakota | EDITED RUN ONe (Feb. 12, 1998) |
939 | 2017-06-26 11:24 | dakota | ADDED RUN ONe (Feb. 12, 1998) |
939 | 2017-06-26 11:23 | dakota | TAKEN |
939 | 2017-06-24 13:48 | whdc | TASK CREATED |
Well 03010304