LOG IN / HELP

<<< BACK TO JOB

Elk Hills Sharepoint import: 03041222

Well construction data was imported from SharePoint, and may conflict with what was already in this database. Look for change log entries with CONFLICT and resolve each conflict. Make a note in the change log if there is an interesting reason for the conflict.

This task is closed and unheld.

See DOGGR well records.

Well construction

Name
Spud date 2010-09-05
Abandon date
Borehole orientation Directional
Measured depth 10000.000
True vertical depth 9984.310
Tperf 7434.000
Bperf 9540.000
Water geochem
No well data
Glog unavailable
Notes

Run headers

Service company Halliburton
Tool HIGH RESOLUTION INDUCTION
Date 2010-09-30
Run number ONE
Driller depth 10000.000
Logger depth 10004.000
Log bottom 9992.000
Log top 7382.000
Casing size 9.625
Bit size 8.500
Mud type SBM
Mud density 10.70
Mud visc (plastic)
Mud visc (funnel) 43.00
Mud ph
Mud fluid loss
Sample source
Circulation stopped time
Logger on bottom time 09:54:00
Time since circulation 13.000
Operating rig time
Notes

G-log curves

2010-09-30 ONE
BS
CALI
CH TENS
DRHO
GR
HDCN
HDRS
HMRS
HT24
NPHI
PE
RHOB
TENS

Temperature and mud resistivity observations

Change log


32152 2018-06-15 11:28 ashley CLOSED, UNHANDED
32152 2018-06-15 11:28 ashley EDITED RUN ONE (Sept. 30, 2010)
32152 2018-06-15 11:24 ashley EDITED WELL METADATA
32152 2018-06-15 11:16 ashley TAKEN
32152 2018-01-10 16:23 whdc TASK CREATED
21259 2018-01-09 14:48 SHAREPOINT IMPORT (mu2) spud_date,tperf,measured_depth,water_geochem,borehole_orientation,notes
21259 2018-01-09 14:48 TASK CREATED
4333 2017-11-07 14:48 francisco CLOSED, UNHANDED
4333 2017-11-07 14:48 francisco EDITED RUN ONE (Sept. 30, 2010)
4333 2017-11-07 14:48 francisco ADDED RUN ONE (Sept. 30, 2010)
4333 2017-11-07 14:46 francisco TAKEN
4333 2017-10-05 09:53 mloustale TASK CREATED
21259 2017-01-01 23:53 ashley CHECKED WELL METADATA (SHAREPOINT)
21259 2017-01-01 23:53 sharepoint-RMB EDITED WELL METADATA (SHAREPOINT)

Well versions and related tasks

Well 03041222