Well construction data was imported from SharePoint, and may conflict with what was already in this database. Look for change log entries with CONFLICT and resolve each conflict. Make a note in the change log if there is an interesting reason for the conflict.
This task is closed and unheld.
Name | |
Spud date | 1998-09-15 |
Abandon date | |
Borehole orientation | Horizontal |
Measured depth | 9750.000 |
True vertical depth | 6222.610 |
Tperf | 5428.000 |
Bperf | 9750.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | HALLIBURTON | Halliburton | Halliburton |
Tool | HIGH RESOLUTION INDUCTION | HIGH RESOLUTION INDUCTION | HIGH RESOLUTION INDUCTION |
Date | 1998-10-05 | 1998-10-11 | 1998-10-23 |
Run number | ONE | TWO | THREE |
Driller depth | 6976.000 | 7197.000 | 9750.000 |
Logger depth | 6950.000 | 7169.000 | 9725.000 |
Log bottom | 6942.000 | 7160.000 | 9715.000 |
Log top | 4800.000 | 7195.000 | |
Casing size | 13.380 | 13.380 | 9.625 |
Bit size | 12.250 | 12.250 | 8.500 |
Mud type | BARITE | BARITE | FLO-PRO |
Mud density | 11.00 | 11.00 | 9.40 |
Mud visc (plastic) | 50.00 | 53.00 | 54.00 |
Mud visc (funnel) | |||
Mud ph | 7.50 | 7.50 | 9.00 |
Mud fluid loss | 9.90 | 9.60 | 7.60 |
Sample source | FLOWLINE | FLOWLINE | FLOWLINE |
Circulation stopped time | |||
Logger on bottom time | 06:45:00 | 16:30:00 | 10:30:00 |
Time since circulation | 42.000 | 8.000 | 12.000 |
Operating rig time | |||
Notes |
31798 | 2018-06-08 13:36 | ashley | CLOSED, UNHANDED |
31798 | 2018-06-08 13:35 | ashley | EDITED RUN ONE (Oct. 5, 1998) |
31798 | 2018-06-08 13:35 | ashley | EDITED RUN TWO (Oct. 11, 1998) |
31798 | 2018-06-08 13:33 | ashley | EDITED RUN ONE (Oct. 5, 1998) |
31798 | 2018-06-08 13:33 | ashley | EDITED RUN THREE (Oct. 23, 1998) |
31798 | 2018-06-08 13:31 | ashley | EDITED RUN THREE (Oct. 23, 1998) |
31798 | 2018-06-08 13:30 | ashley | ADDED RUN THREE (Oct. 23, 1998) |
31798 | 2018-06-08 13:28 | ashley | EDITED RUN TWO (Oct. 11, 1998) |
31798 | 2018-06-08 13:27 | ashley | EDITED RUN ONE (Oct. 5, 1998) |
31798 | 2018-06-08 13:26 | ashley | ADDED RUN TWO (Oct. 11, 1998) |
31798 | 2018-06-08 13:24 | ashley | EDITED RUN ONE (Oct. 5, 1998) |
31798 | 2018-06-08 13:21 | ashley | EDITED WELL METADATA |
31798 | 2018-06-08 13:18 | ashley | TAKEN |
31798 | 2018-01-10 16:23 | whdc | TASK CREATED |
21615 | 2018-01-09 14:48 | SHAREPOINT IMPORT (mu2) spud_date,tperf,measured_depth,water_geochem,borehole_orientation,notes | |
21615 | 2018-01-09 14:48 | TASK CREATED | |
4691 | 2017-11-10 14:47 | robin | CLOSED, UNHANDED |
4691 | 2017-11-10 14:47 | robin | EDITED RUN ONE (Oct. 5, 1998) |
4691 | 2017-11-10 14:45 | robin | EDITED RUN ONE (Oct. 5, 1998) |
4691 | 2017-11-10 14:44 | robin | ADDED RUN ONE (Oct. 5, 1998) |
4691 | 2017-11-10 14:25 | robin | TAKEN |
4691 | 2017-10-05 09:53 | mloustale | TASK CREATED |
21615 | 2017-01-06 23:53 | ashley | CHECKED WELL METADATA (SHAREPOINT) |
21615 | 2017-01-06 23:53 | sharepoint-RMB | EDITED WELL METADATA (SHAREPOINT) |
Well 03011908