Well construction data was imported from SharePoint, and may conflict with what was already in this database. Look for change log entries with CONFLICT and resolve each conflict. Make a note in the change log if there is an interesting reason for the conflict.
This task is closed and unheld.
Name | |
Spud date | 1950-09-16 |
Abandon date | |
Borehole orientation | Directional |
Measured depth | 7512.000 |
True vertical depth | |
Tperf | 6714.000 |
Bperf | 7400.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | Schlumberger | Schlumberger | Schlumberger | Schlumberger | Schlumberger | Schlumberger |
Tool | ELECTRICAL LOG | ELECTRICAL LOG | ELECTRICAL LOG | ELECTRICAL LOG | Electric Log | PLATFORM EXPRESS ARRAY INDUCTION |
Date | 1950-09-20 | 1950-10-11 | 1950-10-11 | 1950-10-23 | 1950-10-23 | 1996-07-18 |
Run number | 1 | 2 | 3 | Induction | Scratcher | 1 |
Driller depth | 3350.000 | 6960.000 | 7010.000 | 7400.000 | 7400.000 | 7512.000 |
Logger depth | 3348.000 | 6957.000 | 7001.000 | 7396.000 | 7396.000 | 7513.000 |
Log bottom | 3347.000 | 6956.000 | 7000.000 | 7392.000 | 7392.000 | 7505.000 |
Log top | 192.000 | 3350.000 | 6956.000 | 7010.000 | 7010.000 | 6345.000 |
Casing size | 7.000 | |||||
Bit size | 15.000 | 9.750 | 9.750 | 6.125 | 6.125 | 6.125 |
Mud type | PYRO | PYRO QUEB. | PYRO QUEB. | GEL OIL | Gel Oil | LSND |
Mud density | 75.00 | 86.00 | 86.00 | 84.00 | 77.00 | |
Mud visc (plastic) | 53.00 | 67.00 | 50.00 | 135.00 | ||
Mud visc (funnel) | 50.00 | |||||
Mud ph | 8.00 | 7.50 | 7.00 | 8.20 | ||
Mud fluid loss | 6.00 | 8.60 | ||||
Sample source | FLOWLINE | |||||
Circulation stopped time | 05:00:00 | |||||
Logger on bottom time | 09:24:00 | |||||
Time since circulation | ||||||
Operating rig time | 2.250 | 1.500 | 2.000 | 1.500 | 1.500 | |
Notes | Fluid loss is in "CC 30 min." not "mL/30 min" | Density is in L/F3; Fluid Loss is in C3 |
31737 | 2018-06-04 15:46 | ashley | CLOSED, UNHANDED |
31737 | 2018-06-04 15:46 | ashley | EDITED RUN 1 (July 18, 1996) |
31737 | 2018-06-04 15:44 | ashley | ADDED RUN Scratcher (Oct. 23, 1950) |
31737 | 2018-06-04 15:42 | ashley | EDITED RUN Induction (Oct. 23, 1950) |
31737 | 2018-06-04 15:40 | ashley | EDITED RUN 3 (Oct. 11, 1950) |
31737 | 2018-06-04 15:39 | ashley | EDITED RUN 2 (Oct. 11, 1950) |
31737 | 2018-06-04 15:37 | ashley | EDITED RUN 1 (Sept. 20, 1950) |
31737 | 2018-06-04 15:34 | ashley | EDITED WELL METADATA |
31737 | 2018-06-04 15:28 | ashley | TAKEN |
31737 | 2018-01-10 16:23 | whdc | TASK CREATED |
21664 | 2018-01-09 14:48 | SHAREPOINT IMPORT (mu2) spud_date,tperf,measured_depth,water_geochem,borehole_orientation,notes | |
21664 | 2018-01-09 14:48 | TASK CREATED | |
4740 | 2017-11-11 16:47 | eramirez | CLOSED, UNHANDED |
4740 | 2017-11-11 16:47 | eramirez | ADDED RUN Induction (Oct. 23, 1950) |
4740 | 2017-11-11 16:45 | eramirez | ADDED RUN 3 (Oct. 11, 1950) |
4740 | 2017-11-11 16:43 | eramirez | ADDED RUN 2 (Oct. 11, 1950) |
4740 | 2017-11-11 16:36 | eramirez | ADDED RUN 1 (Sept. 20, 1950) |
4740 | 2017-11-11 16:34 | eramirez | EDITED RUN 1 (July 18, 1996) |
4740 | 2017-11-11 16:33 | eramirez | ADDED RUN 1 (July 18, 1996) |
4740 | 2017-11-11 16:31 | eramirez | TAKEN |
4740 | 2017-10-05 09:53 | mloustale | TASK CREATED |
21664 | 2017-01-06 23:53 | sharepoint-RMB | EDITED WELL METADATA (SHAREPOINT) |
21664 | 2017-01-06 23:53 | ashley | CHECKED WELL METADATA (SHAREPOINT) |
Well 02927774