Well construction data was imported from SharePoint, and may conflict with what was already in this database. Look for change log entries with CONFLICT and resolve each conflict. Make a note in the change log if there is an interesting reason for the conflict.
This task is closed and unheld.
Name | |
Spud date | 2005-10-23 |
Abandon date | |
Borehole orientation | Directional |
Measured depth | 6053.000 |
True vertical depth | 6039.740 |
Tperf | 5375.000 |
Bperf | 5725.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | Halliburton |
Tool | HIGH RESOLUTION INDUCTION 2"=100' |
Date | 2005-11-02 |
Run number | TWO |
Driller depth | 6053.000 |
Logger depth | 6065.000 |
Log bottom | 6055.000 |
Log top | 2800.000 |
Casing size | 9.625 |
Bit size | 8.750 |
Mud type | SP-101/LOPH |
Mud density | 9.90 |
Mud visc (plastic) | |
Mud visc (funnel) | 34.00 |
Mud ph | 8.40 |
Mud fluid loss | 5.80 |
Sample source | FLOWLINE |
Circulation stopped time | 06:00:00 |
Logger on bottom time | 17:00:00 |
Time since circulation | |
Operating rig time | |
Notes |
31302 | 2018-06-11 12:55 | diana | CLOSED, UNHANDED |
31302 | 2018-06-11 12:55 | diana | EDITED RUN TWO (Nov. 2, 2005) |
31302 | 2018-06-11 12:53 | diana | EDITED WELL METADATA |
31302 | 2018-06-11 12:50 | diana | TAKEN |
31302 | 2018-01-10 16:23 | whdc | TASK CREATED |
22096 | 2018-01-09 14:49 | SHAREPOINT IMPORT (mu2) spud_date,tperf,measured_depth,water_geochem,borehole_orientation,notes | |
22096 | 2018-01-09 14:49 | TASK CREATED | |
5177 | 2017-11-16 15:44 | eramirez | CLOSED, UNHANDED |
5177 | 2017-11-16 15:44 | eramirez | EDITED RUN TWO (Nov. 2, 2005) |
5177 | 2017-11-16 15:44 | eramirez | ADDED RUN TWO (Nov. 2, 2005) |
5177 | 2017-11-16 15:34 | eramirez | TAKEN |
5177 | 2017-10-05 09:53 | mloustale | TASK CREATED |
22096 | 2017-01-11 23:53 | ashley | CHECKED WELL METADATA (SHAREPOINT) |
22096 | 2017-01-11 23:53 | dakota | EDITED WELL METADATA (SHAREPOINT) |
Well 03028503