Well construction data was imported from SharePoint, and may conflict with what was already in this database. Look for change log entries with CONFLICT and resolve each conflict. Make a note in the change log if there is an interesting reason for the conflict.
This task is closed and unheld.
Name | |
Spud date | 2004-06-09 |
Abandon date | |
Borehole orientation | Directional |
Measured depth | 3270.000 |
True vertical depth | 3262.750 |
Tperf | 3054.000 |
Bperf | 3064.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | Reeves Compact Vectar |
Tool | ARRAY INDUCTION SHALLOW FOCUSED ELECTRIC LOG |
Date | 2001-06-11 |
Run number | ONE |
Driller depth | 3270.000 |
Logger depth | 3238.000 |
Log bottom | 3238.000 |
Log top | 50.000 |
Casing size | |
Bit size | 9.880 |
Mud type | GEL/CYPAN |
Mud density | 9.50 |
Mud visc (plastic) | |
Mud visc (funnel) | 41.00 |
Mud ph | 8.30 |
Mud fluid loss | 4.80 |
Sample source | MUD PIT |
Circulation stopped time | |
Logger on bottom time | |
Time since circulation | 4.000 |
Operating rig time | |
Notes |
31285 | 2018-06-05 13:04 | ashley | CLOSED, UNHANDED |
31285 | 2018-06-05 13:04 | ashley | EDITED RUN ONE (June 11, 2001) |
31285 | 2018-06-05 13:02 | ashley | EDITED WELL METADATA |
31285 | 2018-06-05 13:00 | ashley | TAKEN |
31285 | 2018-01-10 16:23 | whdc | TASK CREATED |
22112 | 2018-01-09 14:49 | SHAREPOINT IMPORT (mu2) spud_date,tperf,measured_depth,water_geochem,borehole_orientation,notes | |
22112 | 2018-01-09 14:49 | TASK CREATED | |
5193 | 2017-11-16 16:51 | eramirez | CLOSED, UNHANDED |
5193 | 2017-11-16 16:51 | eramirez | EDITED RUN ONE (June 11, 2001) |
5193 | 2017-11-16 16:50 | eramirez | ADDED RUN ONE (June 11, 2001) |
5193 | 2017-11-16 16:49 | eramirez | TAKEN |
5193 | 2017-10-05 09:53 | mloustale | TASK CREATED |
22112 | 2017-01-11 23:53 | ashley | CHECKED WELL METADATA (SHAREPOINT) |
22112 | 2017-01-11 23:53 | sharepoint-LR | EDITED WELL METADATA (SHAREPOINT) |
Well 03025166