Well construction data was imported from SharePoint, and may conflict with what was already in this database. Look for change log entries with CONFLICT and resolve each conflict. Make a note in the change log if there is an interesting reason for the conflict.
This task is closed and unheld.
Name | |
Spud date | 2012-07-30 |
Abandon date | |
Borehole orientation | Directional |
Measured depth | 4219.000 |
True vertical depth | 4211.130 |
Tperf | 3912.000 |
Bperf | 3942.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes | Active well |
Service company | Halliburton |
Tool | ARRAY COMPENSATED TRUE RESISTIVITY |
Date | 2012-08-03 |
Run number | One |
Driller depth | 4219.000 |
Logger depth | 4220.000 |
Log bottom | 4208.000 |
Log top | 502.000 |
Casing size | 10.750 |
Bit size | 9.875 |
Mud type | LSND |
Mud density | 9.80 |
Mud visc (plastic) | 38.00 |
Mud visc (funnel) | |
Mud ph | 8.50 |
Mud fluid loss | 6.40 |
Sample source | Flow Line |
Circulation stopped time | |
Logger on bottom time | 21:26:00 |
Time since circulation | 8.000 |
Operating rig time | |
Notes |
31152 | 2018-05-17 12:28 | dakota | CLOSED, UNHANDED |
31152 | 2018-05-17 12:27 | dakota | EDITED RUN One (Aug. 3, 2012) |
31152 | 2018-05-17 12:26 | dakota | EDITED WELL METADATA |
31152 | 2018-05-17 12:25 | dakota | TAKEN |
31152 | 2018-01-10 16:23 | whdc | TASK CREATED |
22244 | 2018-01-09 14:49 | SHAREPOINT IMPORT (mu2) spud_date,tperf,measured_depth,water_geochem,borehole_orientation,notes | |
22244 | 2018-01-09 14:49 | TASK CREATED | |
5326 | 2017-11-19 13:08 | fatimaburhan | CLOSED, UNHANDED |
5326 | 2017-11-19 13:08 | fatimaburhan | EDITED RUN One (Aug. 3, 2012) |
5326 | 2017-11-19 13:07 | fatimaburhan | ADDED RUN One (Aug. 3, 2012) |
5326 | 2017-11-19 13:05 | fatimaburhan | TAKEN |
5326 | 2017-10-05 09:53 | mloustale | TASK CREATED |
22244 | 2017-01-12 23:53 | ashley | CHECKED WELL METADATA (SHAREPOINT) |
22244 | 2017-01-12 23:53 | dakota | EDITED WELL METADATA (SHAREPOINT) |
Well 03045629