Well construction data was imported from SharePoint, and may conflict with what was already in this database. Look for change log entries with CONFLICT and resolve each conflict. Make a note in the change log if there is an interesting reason for the conflict.
This task is closed and unheld.
Name | |
Spud date | 1984-05-11 |
Abandon date | 2007-11-20 |
Borehole orientation | Directional |
Measured depth | 1255.000 |
True vertical depth | |
Tperf | 1168.000 |
Bperf | 1207.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | Schlumberger |
Tool | DUAL INDUCTION - SFL |
Date | 1984-05-15 |
Run number | One |
Driller depth | 1255.000 |
Logger depth | 1256.000 |
Log bottom | 1250.000 |
Log top | 317.000 |
Casing size | 10.750 |
Bit size | 9.875 |
Mud type | FGM |
Mud density | 69.00 |
Mud visc (plastic) | 41.00 |
Mud visc (funnel) | |
Mud ph | 8.20 |
Mud fluid loss | 10.20 |
Sample source | CIRC. |
Circulation stopped time | 08:30:00 |
Logger on bottom time | 10:00:00 |
Time since circulation | |
Operating rig time | |
Notes |
31139 | 2018-05-17 11:00 | dakota | CLOSED, UNHANDED |
31139 | 2018-05-17 10:59 | dakota | EDITED WELL METADATA |
31139 | 2018-05-17 10:56 | dakota | TAKEN |
31139 | 2018-01-10 16:23 | whdc | TASK CREATED |
22258 | 2018-01-09 14:49 | SHAREPOINT IMPORT (mu2) spud_date,abandon_date,tperf,measured_depth,water_geochem,borehole_orientation | |
22258 | 2018-01-09 14:49 | TASK CREATED | |
5340 | 2017-11-19 14:07 | fatimaburhan | CLOSED, UNHANDED |
5340 | 2017-11-19 14:07 | fatimaburhan | EDITED RUN One (May 15, 1984) |
5340 | 2017-11-19 14:07 | fatimaburhan | ADDED RUN One (May 15, 1984) |
5340 | 2017-11-19 14:04 | fatimaburhan | TAKEN |
5340 | 2017-10-05 09:53 | mloustale | TASK CREATED |
22258 | 2017-01-12 23:53 | ashley | CHECKED WELL METADATA (SHAREPOINT) |
22258 | 2017-01-12 23:53 | sharepoint-LR | EDITED WELL METADATA (SHAREPOINT) |
Well 02971919