Well construction data was imported from SharePoint, and may conflict with what was already in this database. Look for change log entries with CONFLICT and resolve each conflict. Make a note in the change log if there is an interesting reason for the conflict.
This task is closed and unheld.
Name | |
Spud date | 1949-11-18 |
Abandon date | |
Borehole orientation | Directional |
Measured depth | 6438.000 |
True vertical depth | 6432.180 |
Tperf | 5020.000 |
Bperf | 6322.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes | Active well |
Service company | Schlumberger | Schlumberger |
Tool | ELECTRIC LOG | ELECTRIC LOG |
Date | 1949-11-22 | 1949-12-03 |
Run number | 1 | 2 |
Driller depth | 2500.000 | 5375.000 |
Logger depth | 2497.000 | 5360.000 |
Log bottom | 2496.000 | 2500.000 |
Log top | 194.000 | 2860.000 |
Casing size | ||
Bit size | 15.000 | 9.625 |
Mud type | Pyro Queb | Ken Oil |
Mud density | 75.00 | 85.00 |
Mud visc (plastic) | 45.00 | 140.00 |
Mud visc (funnel) | ||
Mud ph | ||
Mud fluid loss | ||
Sample source | ||
Circulation stopped time | ||
Logger on bottom time | ||
Time since circulation | ||
Operating rig time | 1.750 | 4.000 |
Notes |
30834 | 2018-05-10 13:02 | dakota | CLOSED, UNHANDED |
30834 | 2018-05-10 13:00 | dakota | EDITED WELL METADATA |
30834 | 2018-05-10 12:58 | dakota | TAKEN |
30834 | 2018-01-10 16:23 | whdc | TASK CREATED |
22552 | 2018-01-09 14:49 | SHAREPOINT IMPORT (mu2) spud_date,tperf,measured_depth,water_geochem,borehole_orientation,notes | |
22552 | 2018-01-09 14:49 | TASK CREATED | |
5636 | 2017-11-22 13:56 | fatimaburhan | CLOSED, UNHANDED |
5636 | 2017-11-22 13:56 | fatimaburhan | ADDED RUN 2 (Dec. 3, 1949) |
5636 | 2017-11-22 13:54 | fatimaburhan | ADDED RUN 1 (Nov. 22, 1949) |
5636 | 2017-11-22 13:48 | fatimaburhan | TAKEN |
5636 | 2017-10-05 09:53 | mloustale | TASK CREATED |
22552 | 2017-01-16 23:53 | ashley | CHECKED WELL METADATA (SHAREPOINT) |
22552 | 2017-01-16 23:53 | sharepoint-EF | EDITED WELL METADATA (SHAREPOINT) |
Well 02927120