Well construction data was imported from SharePoint, and may conflict with what was already in this database. Look for change log entries with CONFLICT and resolve each conflict. Make a note in the change log if there is an interesting reason for the conflict.
This task is closed and unheld.
Name | |
Spud date | 1991-06-24 |
Abandon date | |
Borehole orientation | Vertical |
Measured depth | 3800.000 |
True vertical depth | |
Tperf | 3440.000 |
Bperf | 3511.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes | Active well |
Service company | Western Atlas International |
Tool | DUAL PHASED INDUCTION SPHERICALLY FOCUSED LOG |
Date | 1991-07-09 |
Run number | 1 |
Driller depth | 3800.000 |
Logger depth | 3800.000 |
Log bottom | 3789.000 |
Log top | 390.000 |
Casing size | 10.750 |
Bit size | 9.875 |
Mud type | F. W. POLYMER EMUL. |
Mud density | 80.00 |
Mud visc (plastic) | |
Mud visc (funnel) | 40.00 |
Mud ph | 8.00 |
Mud fluid loss | 5.10 |
Sample source | FLOWLINE |
Circulation stopped time | |
Logger on bottom time | |
Time since circulation | 2.000 |
Operating rig time | |
Notes | density: LB/F3 |
30126 | 2018-04-17 11:27 | dakota | CLOSED, UNHANDED |
30126 | 2018-04-17 11:26 | dakota | EDITED RUN 1 (July 9, 1991) |
30126 | 2018-04-17 11:21 | dakota | EDITED WELL METADATA |
30126 | 2018-04-17 11:12 | dakota | TAKEN |
30126 | 2018-01-10 16:23 | whdc | TASK CREATED |
23224 | 2018-01-09 14:49 | SHAREPOINT IMPORT (mu2) spud_date,tperf,measured_depth,water_geochem,borehole_orientation,notes | |
23224 | 2018-01-09 14:49 | TASK CREATED | |
6317 | 2017-12-01 15:28 | hannaho | CLOSED, UNHANDED |
6317 | 2017-12-01 15:28 | hannaho | EDITED RUN 1 (July 9, 1991) |
6317 | 2017-12-01 15:28 | hannaho | ADDED RUN 1 (July 9, 1991) |
6317 | 2017-12-01 15:21 | hannaho | TAKEN |
6317 | 2017-10-05 09:53 | mloustale | TASK CREATED |
23224 | 2017-01-22 23:53 | ashley | CHECKED WELL METADATA (SHAREPOINT) |
23224 | 2017-01-22 23:53 | hannaho | EDITED WELL METADATA (SHAREPOINT) |
Well 02988841