Well construction data was imported from SharePoint, and may conflict with what was already in this database. Look for change log entries with CONFLICT and resolve each conflict. Make a note in the change log if there is an interesting reason for the conflict.
This task is closed and unheld.
Name | |
Spud date | 1951-08-28 |
Abandon date | |
Borehole orientation | Vertical |
Measured depth | 7155.000 |
True vertical depth | |
Tperf | 6830.000 |
Bperf | 7090.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes | Active well; Production converted into injection |
Service company | SCHLUMBERGER | SCHLUMBERGER | SCHLUMBERGER | SCHLUMBERGER |
Tool | ELECTRICAL LOG | ELECTRICAL LOG | ELECTRICAL LOG | ELECTRICAL LOG |
Date | 1951-09-02 | 1951-09-20 | 1951-09-24 | 1951-09-24 |
Run number | 1 | 2 | INDUCTION | SCRATCHER |
Driller depth | 3350.000 | 6752.000 | 7155.000 | 7155.000 |
Logger depth | 3350.000 | 6753.000 | 7146.000 | 7145.000 |
Log bottom | 3349.000 | 6752.000 | 7142.000 | 7145.000 |
Log top | 203.000 | 3350.000 | 6752.000 | 6752.000 |
Casing size | ||||
Bit size | 15.000 | 9.750 | 9.750 | 9.750 |
Mud type | Rogers Lk | P-95 QUEB. | JEL OIL | JEL OIL |
Mud density | 75.00 | 87.00 | 88.00 | 88.00 |
Mud visc (plastic) | 48.00 | 60.00 | 107.00 | 107.00 |
Mud visc (funnel) | ||||
Mud ph | 8.00 | 8.00 | ||
Mud fluid loss | ||||
Sample source | ||||
Circulation stopped time | ||||
Logger on bottom time | ||||
Time since circulation | ||||
Operating rig time | 6.000 | 2.000 | 1.500 | 1.500 |
Notes |
29432 | 2018-03-05 13:25 | ashley | CLOSED, UNHANDED |
29432 | 2018-03-05 13:22 | ashley | EDITED RUN INDUCTION (Sept. 24, 1951) |
29432 | 2018-03-05 13:21 | ashley | EDITED RUN SCRATCHER (Sept. 24, 1951) |
29432 | 2018-03-05 13:18 | ashley | EDITED RUN 2 (Sept. 20, 1951) |
29432 | 2018-03-05 13:17 | ashley | EDITED RUN 1 (Sept. 2, 1951) |
29432 | 2018-03-05 13:13 | ashley | EDITED WELL METADATA |
29432 | 2018-03-05 13:08 | ashley | TAKEN |
29432 | 2018-01-10 16:23 | whdc | TASK CREATED |
23687 | 2018-01-09 14:49 | SHAREPOINT IMPORT (mu2) spud_date,tperf,measured_depth,water_geochem,borehole_orientation,notes | |
23687 | 2018-01-09 14:49 | TASK CREATED | |
6784 | 2017-12-09 17:32 | annerobertson | CLOSED, UNHANDED |
6784 | 2017-12-09 17:32 | annerobertson | EDITED RUN INDUCTION (Sept. 24, 1951) |
6784 | 2017-12-09 17:31 | annerobertson | EDITED RUN SCRATCHER (Sept. 24, 1951) |
6784 | 2017-12-09 17:31 | annerobertson | EDITED RUN 2 (Sept. 20, 1951) |
6784 | 2017-12-09 17:30 | annerobertson | EDITED RUN 1 (Sept. 2, 1951) |
6784 | 2017-12-09 17:30 | annerobertson | TAKEN, REOPENED |
6784 | 2017-12-09 16:35 | annerobertson | CLOSED, UNHANDED |
6784 | 2017-12-09 16:35 | annerobertson | EDITED RUN INDUCTION (Sept. 24, 1951) |
6784 | 2017-12-09 16:35 | annerobertson | EDITED RUN SCRATCHER (Sept. 24, 1951) |
6784 | 2017-12-09 16:34 | annerobertson | TAKEN, REOPENED |
6784 | 2017-12-09 16:24 | annerobertson | CLOSED, UNHANDED |
6784 | 2017-12-09 16:23 | annerobertson | ADDED RUN INDUCTION (Sept. 24, 1951) |
6784 | 2017-12-09 16:20 | annerobertson | ADDED RUN SCRATCHER (Sept. 24, 1951) |
6784 | 2017-12-09 16:16 | annerobertson | ADDED RUN 2 (Sept. 20, 1951) |
6784 | 2017-12-09 16:12 | annerobertson | ADDED RUN 1 (Sept. 2, 1951) |
6784 | 2017-12-09 16:00 | annerobertson | TAKEN |
6784 | 2017-12-08 16:38 | eramirez | UNHANDED |
6784 | 2017-12-08 16:38 | eramirez | TAKEN |
6784 | 2017-12-08 13:04 | powen | UNHANDED |
6784 | 2017-12-08 13:04 | powen | TAKEN |
6784 | 2017-10-05 09:53 | mloustale | TASK CREATED |
23687 | 2017-01-28 23:53 | ashley | CHECKED WELL METADATA (SHAREPOINT) |
23687 | 2017-01-28 23:53 | sharepoint-CB | EDITED WELL METADATA (SHAREPOINT) |
Well 02927660