Well construction data was imported from SharePoint, and may conflict with what was already in this database. Look for change log entries with CONFLICT and resolve each conflict. Make a note in the change log if there is an interesting reason for the conflict.
This task is closed and unheld.
Name | |
Spud date | 1990-04-22 |
Abandon date | |
Borehole orientation | Directional |
Measured depth | 732.000 |
True vertical depth | |
Tperf | 370.000 |
Bperf | 582.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes | Active well |
Service company | Atlas Wireline Services |
Tool | DUAL INDUCTION FOCUSED LOG |
Date | 1990-04-27 |
Run number | 1 |
Driller depth | 732.000 |
Logger depth | 728.000 |
Log bottom | 726.000 |
Log top | 308.000 |
Casing size | 10.750 |
Bit size | 6.250 |
Mud type | GEL/WATER |
Mud density | 64.00 |
Mud visc (plastic) | 45.00 |
Mud visc (funnel) | |
Mud ph | 9.50 |
Mud fluid loss | |
Sample source | Flowline |
Circulation stopped time | |
Logger on bottom time | |
Time since circulation | 2.000 |
Operating rig time | |
Notes |
28695 | 2018-02-15 16:11 | dakota | CLOSED, UNHANDED |
28695 | 2018-02-15 16:10 | dakota | EDITED RUN 1 (April 27, 1990) |
28695 | 2018-02-15 16:09 | dakota | EDITED WELL METADATA |
28695 | 2018-02-15 16:07 | dakota | TAKEN |
28695 | 2018-01-10 16:23 | whdc | TASK CREATED |
24467 | 2018-01-09 14:49 | SHAREPOINT IMPORT (mu2) spud_date,measured_depth,water_geochem,borehole_orientation,notes | |
24467 | 2018-01-09 14:49 | TASK CREATED | |
7573 | 2017-12-19 13:13 | fatimaburhan | CLOSED, UNHANDED |
7573 | 2017-12-19 13:13 | fatimaburhan | EDITED RUN 1 (April 27, 1990) |
7573 | 2017-12-19 13:12 | fatimaburhan | ADDED RUN 1 (April 27, 1990) |
7573 | 2017-12-19 13:10 | fatimaburhan | TAKEN |
7573 | 2017-10-05 09:53 | mloustale | TASK CREATED |
24467 | 2017-03-18 00:53 | ashley | CHECKED WELL METADATA (SHAREPOINT) |
24467 | 2017-03-18 00:53 | hannaho | EDITED WELL METADATA (SHAREPOINT) |
Well 02985822