Well construction data was imported from SharePoint, and may conflict with what was already in this database. Look for change log entries with CONFLICT and resolve each conflict. Make a note in the change log if there is an interesting reason for the conflict.
This task is closed and unheld.
Name | |
Spud date | 2007-08-04 |
Abandon date | |
Borehole orientation | Directional |
Measured depth | 7090.000 |
True vertical depth | 6261.340 |
Tperf | 5340.000 |
Bperf | 664.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes | Active well |
Service company | Halliburton |
Tool | HIGH RESOLUTION INDUCTION 2"=100' |
Date | 2007-08-14 |
Run number | ONE |
Driller depth | 7090.000 |
Logger depth | 7090.000 |
Log bottom | 7080.000 |
Log top | 5308.000 |
Casing size | 7.625 |
Bit size | 6.750 |
Mud type | LSND |
Mud density | 9.00 |
Mud visc (plastic) | 41.00 |
Mud visc (funnel) | |
Mud ph | 8.00 |
Mud fluid loss | 5.80 |
Sample source | FLOWLINE |
Circulation stopped time | |
Logger on bottom time | 01:15:00 |
Time since circulation | 21.000 |
Operating rig time | |
Notes |
28050 | 2018-02-08 13:57 | dakota | CLOSED, UNHANDED |
28050 | 2018-02-08 13:56 | dakota | EDITED WELL METADATA |
28050 | 2018-02-08 13:54 | dakota | TAKEN |
28050 | 2018-01-10 16:23 | whdc | TASK CREATED |
25506 | 2018-01-09 14:49 | SHAREPOINT IMPORT (mu2) spud_date,tperf,measured_depth,water_geochem,borehole_orientation,notes | |
25506 | 2018-01-09 14:49 | TASK CREATED | |
8622 | 2017-12-25 22:18 | HLoss1 | CLOSED, UNHANDED |
8622 | 2017-12-25 22:18 | HLoss1 | EDITED RUN ONE (Aug. 14, 2007) |
8622 | 2017-12-25 22:17 | HLoss1 | ADDED RUN ONE (Aug. 14, 2007) |
8622 | 2017-12-25 22:16 | HLoss1 | TAKEN |
8622 | 2017-10-05 09:53 | mloustale | TASK CREATED |
25506 | 2017-04-04 00:53 | ashley | CHECKED WELL METADATA (SHAREPOINT) |
25506 | 2017-04-04 00:53 | eramirez | EDITED WELL METADATA (SHAREPOINT) |
Well 03033687