Well construction data was imported from SharePoint, and may conflict with what was already in this database. Look for change log entries with CONFLICT and resolve each conflict. Make a note in the change log if there is an interesting reason for the conflict.
This task is closed and unheld.
Name | |
Spud date | 2012-12-01 |
Abandon date | |
Borehole orientation | Directional |
Measured depth | 1249.000 |
True vertical depth | 1248.700 |
Tperf | |
Bperf | |
Water geochem | |
No well data | |
Glog unavailable | |
Notes | Active well |
Service company | HALLIBURTON |
Tool | ARRAY COMPENSATED TRUE RESISTIVITY |
Date | 2012-12-02 |
Run number | ONE |
Driller depth | 1249.000 |
Logger depth | 1266.000 |
Log bottom | 1250.000 |
Log top | 54.000 |
Casing size | 10.750 |
Bit size | 9.875 |
Mud type | DIF/GEOZAN |
Mud density | 8.60 |
Mud visc (plastic) | |
Mud visc (funnel) | 40.00 |
Mud ph | 9.00 |
Mud fluid loss | 14.80 |
Sample source | MEAS |
Circulation stopped time | |
Logger on bottom time | 18:12:00 |
Time since circulation | 3.500 |
Operating rig time | |
Notes |
27754 | 2018-02-02 10:05 | ashley | CLOSED, UNHANDED |
27754 | 2018-02-02 10:05 | ashley | EDITED RUN ONE (Dec. 2, 2012) |
27754 | 2018-02-02 10:00 | ashley | EDITED WELL METADATA |
27754 | 2018-02-02 09:58 | ashley | TAKEN |
27754 | 2018-01-10 16:23 | whdc | TASK CREATED |
26018 | 2018-01-09 14:49 | SHAREPOINT IMPORT (mu2) spud_date,measured_depth,water_geochem,borehole_orientation,notes | |
26018 | 2018-01-09 14:49 | TASK CREATED | |
9144 | 2017-12-28 09:42 | francisco | CLOSED, UNHANDED |
9144 | 2017-12-28 09:42 | francisco | EDITED RUN ONE (Dec. 2, 2012) |
9144 | 2017-12-28 09:42 | francisco | ADDED RUN ONE (Dec. 2, 2012) |
9144 | 2017-12-28 09:40 | francisco | TAKEN |
9144 | 2017-10-05 09:53 | mloustale | TASK CREATED |
26018 | 2017-04-08 00:53 | ashley | CHECKED WELL METADATA (SHAREPOINT) |
26018 | 2017-04-08 00:53 | sharepoint-LR | EDITED WELL METADATA (SHAREPOINT) |
Well 03045663