LOG IN / HELP

<<< BACK TO JOB

Elk Hills QC: 02927540

QC all data (well construction, run header, g-log curves, mud/temperature).

This task is closed and unheld.

See DOGGR well records.

Well construction

Name
Spud date 1945-06-28
Abandon date 2002-03-05
Borehole orientation Vertical
Measured depth 2848.000
True vertical depth
Tperf 2571.000
Bperf 2656.000
Water geochem
No well data
Glog unavailable
Notes

Run headers

Service company Schlumberger Halliburton Halliburton
Tool ELECTRIC LOG HIGH RESOLUTION INDUCTION 2"=100' HIGH RESOLUTION INDUCTION
Date 1945-07-09 1945-07-09 1999-10-28
Run number 1 ONE TWO
Driller depth 2700.000 2700.000 2848.000
Logger depth 2700.000 2700.000 2851.000
Log bottom 2700.000 2842.000
Log top 208.000 207.000 2698.000
Casing size 10.625 10.750 7.000
Bit size 6.250
Mud type CHEM CHEM GEL/SP101
Mud density 73.00 7.30 9.20
Mud visc (plastic) 40.00 40.00 47.00
Mud visc (funnel)
Mud ph
Mud fluid loss
Sample source FLOWLINE
Circulation stopped time
Logger on bottom time 05:30:00
Time since circulation 2.000
Operating rig time 1.000
Notes

G-log curves

1945-07-09 1
AM 20"
OA 8 1/2'
SELF POTENTIAL
1945-07-09 ONE
BIT SIZE
Bulk Density
CALIPER
CH TENSION
DEEP COND
DEEP RES
Den Corr
DFL
GAMMA RAY
Medium Res
Neu Porosity
PE
SP
TENSION
1999-10-28 TWO
BIT SIZE
Bulk Density
CALIPER
CH TENSION
DEEP COND
DEEP RES
DEN CORR
DFL
GAMMA RAY
Medium Res
Neu Porosity
PE
SP
TENSION

Temperature and mud resistivity observations

1945-07-09 1
Rm = 7.100 Ωm
1999-10-28 TWO
Rm = 1.565 Ωm @ 122.000 °F (MRT, 2851.000 ft)
Rm = 2.930 Ωm @ 62.000 °F
Rmc = 3.220 Ωm @ 60.000 °F
Rmf = 2.870 Ωm @ 60.000 °F

Change log


27250 2018-01-18 12:27 ashley CLOSED, UNHANDED
27250 2018-01-18 12:27 ashley EDITED RUN TWO (Oct. 28, 1999)
27250 2018-01-18 12:26 ashley EDITED RUN ONE (July 9, 1945)
27250 2018-01-18 12:23 ashley EDITED RUN TWO (Oct. 28, 1999)
27250 2018-01-18 12:22 ashley EDITED RUN ONE (July 9, 1945)
27250 2018-01-18 12:20 ashley EDITED RUN 1 (July 9, 1945)
27250 2018-01-18 12:18 ashley EDITED WELL METADATA
27250 2018-01-18 12:15 ashley TAKEN
27250 2018-01-10 16:23 whdc TASK CREATED
25710 2018-01-09 14:49 SHAREPOINT IMPORT (mu2) spud_date,abandon_date,tperf,measured_depth,water_geochem,borehole_orientation
25710 2018-01-09 14:49 TASK CREATED
8829 2018-01-02 22:06 HLoss1 CLOSED, UNHANDED
8829 2018-01-02 22:05 HLoss1 EDITED RUN 1 (July 9, 1945)
8829 2018-01-02 22:05 HLoss1 ADDED RUN 1 (July 9, 1945)
8829 2018-01-02 22:04 HLoss1 EDITED RUN TWO (Oct. 28, 1999)
8829 2018-01-02 22:03 HLoss1 ADDED RUN TWO (Oct. 28, 1999)
8829 2018-01-02 22:01 HLoss1 ADDED RUN ONE (July 9, 1945)
8829 2018-01-02 22:00 HLoss1 TAKEN
8829 2017-10-05 09:53 mloustale TASK CREATED
25710 2017-04-06 00:53 sharepoint-JG EDITED WELL METADATA (SHAREPOINT)
25710 2017-04-06 00:53 ashley CHECKED WELL METADATA (SHAREPOINT)

Well versions and related tasks

Well 02927540