LOG IN / HELP

<<< BACK TO JOB

Elk Hills QC: 03015724

QC all data (well construction, run header, g-log curves, mud/temperature).

This task is closed and unheld.

See DOGGR well records.

Well construction

Name
Spud date 2000-05-17
Abandon date
Borehole orientation Directional
Measured depth 6667.000
True vertical depth 6553.190
Tperf 4790.000
Bperf 6504.000
Water geochem
No well data
Glog unavailable
Notes Active well

Run headers

Service company Schlumberger Halliburton
Tool PLATFORM EXPRESS 2"=100' ARRAY INDUCTION/SP GAMMA RAY HIGH RESOLUTION INDUCTION
Date 2000-05-29 2009-08-02
Run number ONE ONE
Driller depth 6598.000 6667.000
Logger depth 6590.000 6680.000
Log bottom 6582.000 6670.000
Log top 1022.000 4500.000
Casing size 9.625 7.000
Bit size 8.750 6.125
Mud type LSND SP101/Gel
Mud density 10.60 10.10
Mud visc (plastic) 45.00
Mud visc (funnel) 44.00
Mud ph 9.00 8.40
Mud fluid loss 5.10 4.10
Sample source FLOWLINE FLOWLINE
Circulation stopped time 17:00:00
Logger on bottom time 23:45:00 03:11:00
Time since circulation 17.000
Operating rig time
Notes

G-log curves

2000-05-29 ONE
AIT-H 30 Inch Investigation (AHF30)
AIT-H 90 Inch Investigation (AHF90)
AIT-H 90 Inch Investigation Conductivity (AHFCO90)
Gamma Ray (GR)
SP
2009-08-02 ONE
BS
CALI
DFL
GR
HDCN
HDRS
SP

Temperature and mud resistivity observations

2000-05-29 ONE
Rm = 1.529 Ωm @ 145.000 °F (MRT, 6590.000 ft)
Rmf = 0.983 Ωm @ 145.000 °F (MRT, 6590.000 ft)
2009-08-02 ONE
Rm = 1.420 Ωm @ 147.000 °F (MRT, 6680.000 ft)
Rm = 2.550 Ωm @ 79.000 °F
Rmc = 3.150 Ωm @ 79.000 °F
Rmf = 2.340 Ωm @ 79.000 °F

Change log


28224 2018-02-08 15:34 ashley CLOSED, UNHANDED
28224 2018-02-08 15:32 ashley EDITED RUN ONE (Aug. 2, 2009)
28224 2018-02-08 15:31 ashley EDITED RUN ONE (May 29, 2000)
28224 2018-02-08 15:30 ashley ADDED RUN ONE (May 29, 2000)
28224 2018-02-08 15:24 ashley EDITED RUN ONE (Aug. 2, 2009)
28224 2018-02-08 15:18 ashley EDITED WELL METADATA
28224 2018-02-08 15:11 ashley TAKEN
28224 2018-01-10 16:23 whdc TASK CREATED
24968 2018-01-09 14:49 SHAREPOINT IMPORT (mu2) spud_date,tperf,measured_depth,water_geochem,borehole_orientation,notes
24968 2018-01-09 14:49 TASK CREATED
8077 2017-12-21 14:14 fatimaburhan CLOSED, UNHANDED
8077 2017-12-21 14:14 fatimaburhan EDITED RUN ONE (Aug. 2, 2009)
8077 2017-12-21 14:13 fatimaburhan ADDED RUN ONE (Aug. 2, 2009)
8077 2017-12-21 14:11 fatimaburhan TAKEN
8077 2017-10-05 09:53 mloustale TASK CREATED
24968 2017-03-27 00:53 sharepoint-JG EDITED WELL METADATA (SHAREPOINT)
24968 2017-03-27 00:53 ashley CHECKED WELL METADATA (SHAREPOINT)

Well versions and related tasks

Well 03015724