QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 2009-10-04 |
Abandon date | |
Borehole orientation | Directional |
Measured depth | 2797.000 |
True vertical depth | 2760.950 |
Tperf | 1393.000 |
Bperf | 2317.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes | Active well; Dry gas only |
Service company | Schlumberger |
Tool | PLATFORM EXPRESS 2"-100' ARRAY INDUCTION/GR DENSITY/NEUTRON |
Date | 2009-10-06 |
Run number | ONE |
Driller depth | 2797.000 |
Logger depth | 2798.000 |
Log bottom | 2789.000 |
Log top | 1174.000 |
Casing size | 9.625 |
Bit size | 9.500 |
Mud type | SP 101/GEL |
Mud density | 9.80 |
Mud visc (plastic) | 50.00 |
Mud visc (funnel) | |
Mud ph | 5.00 |
Mud fluid loss | 8.00 |
Sample source | MUD PIT |
Circulation stopped time | 08:00:00 |
Logger on bottom time | 13:40:00 |
Time since circulation | |
Operating rig time | |
Notes |
28737 | 2018-02-16 11:37 | ashley | CLOSED, UNHANDED |
28737 | 2018-02-16 11:37 | ashley | EDITED RUN ONE (Oct. 6, 2009) |
28737 | 2018-02-16 11:34 | ashley | EDITED WELL METADATA |
28737 | 2018-02-16 11:31 | ashley | TAKEN |
28737 | 2018-01-10 16:23 | whdc | TASK CREATED |
24435 | 2018-01-09 14:49 | SHAREPOINT IMPORT (mu2) spud_date,tperf,measured_depth,water_geochem,borehole_orientation,notes | |
24435 | 2018-01-09 14:49 | TASK CREATED | |
7541 | 2017-12-19 11:38 | fatimaburhan | CLOSED, UNHANDED |
7541 | 2017-12-19 11:38 | fatimaburhan | EDITED RUN ONE (Oct. 6, 2009) |
7541 | 2017-12-19 11:37 | fatimaburhan | ADDED RUN ONE (Oct. 6, 2009) |
7541 | 2017-12-19 11:34 | fatimaburhan | TAKEN |
10412 | 2017-10-28 14:50 | whdc | TASK CREATED |
7541 | 2017-10-05 09:53 | mloustale | TASK CREATED |
24435 | 2017-03-17 00:53 | ashley | CHECKED WELL METADATA (SHAREPOINT) |
24435 | 2017-03-17 00:53 | sharepoint-CB | EDITED WELL METADATA (SHAREPOINT) |
Well 03039339