QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 2006-12-14 |
Abandon date | |
Borehole orientation | Directional |
Measured depth | 2745.000 |
True vertical depth | 2723.060 |
Tperf | 2557.000 |
Bperf | 2562.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes | Active well; Production converted into injection |
Service company | Halliburton |
Tool | HIGH RESOLUTION ARRAY INDUCTION |
Date | 2006-12-18 |
Run number | ONE |
Driller depth | 2745.000 |
Logger depth | 2749.000 |
Log bottom | 2739.000 |
Log top | 989.000 |
Casing size | 9.625 |
Bit size | 9.875 |
Mud type | LSND |
Mud density | 9.80 |
Mud visc (plastic) | 40.00 |
Mud visc (funnel) | |
Mud ph | 7.90 |
Mud fluid loss | 6.20 |
Sample source | FLOWLINE |
Circulation stopped time | |
Logger on bottom time | 07:00:00 |
Time since circulation | 2.000 |
Operating rig time | |
Notes |
29467 | 2018-03-06 17:37 | ashley | CLOSED, UNHANDED |
29467 | 2018-03-06 17:37 | ashley | EDITED RUN ONE (Dec. 18, 2006) |
29467 | 2018-03-06 17:34 | ashley | EDITED WELL METADATA |
29467 | 2018-03-06 17:32 | ashley | TAKEN |
29467 | 2018-01-10 16:23 | whdc | TASK CREATED |
23882 | 2018-01-09 14:49 | SHAREPOINT IMPORT (mu2) spud_date,tperf,measured_depth,water_geochem,borehole_orientation,notes | |
23882 | 2018-01-09 14:49 | TASK CREATED | |
6980 | 2017-12-08 17:20 | eramirez | CLOSED, UNHANDED |
6980 | 2017-12-08 17:20 | eramirez | EDITED RUN ONE (Dec. 18, 2006) |
6980 | 2017-12-08 17:20 | eramirez | EDITED RUN ONE (Dec. 18, 2006) |
6980 | 2017-12-08 17:19 | eramirez | ADDED RUN ONE (Dec. 18, 2006) |
6980 | 2017-12-08 17:18 | eramirez | TAKEN |
6980 | 2017-10-05 09:53 | mloustale | TASK CREATED |
23882 | 2017-01-29 23:53 | ashley | CHECKED WELL METADATA (SHAREPOINT) |
23882 | 2017-01-29 23:53 | sharepoint-LR | EDITED WELL METADATA (SHAREPOINT) |
Well 03032043