LOG IN / HELP

<<< BACK TO JOB

Elk Hills QC: 03033675

QC all data (well construction, run header, g-log curves, mud/temperature).

This task is closed and unheld.

See DOGGR well records.

Well construction

Name
Spud date 2007-07-19
Abandon date
Borehole orientation Directional
Measured depth 6416.000
True vertical depth 5941.670
Tperf 5646.000
Bperf 6138.000
Water geochem
No well data
Glog unavailable
Notes Active well

Run headers

Service company SCHLUMBERGER SCHLUMBERGER SCHLUMBERGER
Tool PLATFORM EXPRESS 2IN = 100FT ARRAY INDUCTION/GR/SP DENSITY/NEUTRON PLATFORM EXPRESS 2IN = 100FT ARRAY INDUCTION/GR/SP DENSITY/NEUTRON PLATFORM EXPRESS 2IN = 100FT ARRAY INDUCTION/GR/SP DENSITY/NEUTRON
Date 2007-07-23 2007-07-28 2007-07-28
Run number ONE THIRD TWO
Driller depth 3218.000 6416.000 6416.000
Logger depth 3166.000 6381.000 5615.000
Log bottom 3158.000 6381.000 5607.000
Log top 408.000 5270.000 3207.000
Casing size 13.375 9.625 9.625
Bit size 12.250 9.500 9.500
Mud type SP-101 SP-101 SP-101
Mud density 9.30 10.40 10.40
Mud visc (plastic) 43.00 43.00 48.00
Mud visc (funnel)
Mud ph 7.90 8.20 8.20
Mud fluid loss 6.00 5.80 5.80
Sample source FLOWLINE FLOWLINE FLOWLINE
Circulation stopped time 00:30:00 18:30:00 18:30:00
Logger on bottom time 05:04:00 15:11:00 02:38:00
Time since circulation
Operating rig time
Notes FLUID LOSS IN cm3 FLUID LOSS IN cm3 FLUID LOSS IN cm3

G-log curves

2007-07-23 ONE
AIT-H 10 Inch Investigation (AHT10)
AIT-H 10 Inch Investigation (AHT10)
AIT-H 90 Inch Investigation (AHT90)
AIT-H 90 Inch Investigation Conductivity (AHTCO90)
Bit Size (BS)
Caliper (HCAL)
Gamma Ray (GR) (GAPI)
Micro Inverse Resistivity (BMIN)
MICRO NORMAL RESISTIVITY (BMNO)
SP (SP)
2007-07-28 THIRD
AIT 10 Inch Investigation (AT10)
AIT 90 Inch Investigation (AT90)
AIT 90 Inch Investigation Conductivity (ATCO90)
AIT-H 10 Inch Investigation (AHT10)
Bit Size (BS)
Caliper (HCAL)
Gamma Ray (GR) (GAPI)
Micro Inverse Resistivity (BMIN)
MICRO NORMAL RESISTIVITY (BMNO)
SP (SP)
2007-07-28 TWO
AIT-H 10 Inch Investigation (AHT10)
AIT-H 10 Inch Investigation (AHT10)
AIT-H 90 Inch Investigation (AHT90)
AIT-H 90 Inch Investigation Conductivity (AHTCO90)
Bit Size (BS)
Caliper (HCAL)
Gamma Ray (GR) (GAPI)
Micro Inverse Resistivity (BMIN)
MICRO NORMAL RESISTIVITY (BMNO)
SP (SP)

Temperature and mud resistivity observations

2007-07-23 ONE
Rm = 1.312 Ωm @ 120.000 °F (MRT, 3166.000 ft)
Rmf = 1.291 Ωm @ 120.000 °F (MRT, 3166.000 ft)
Rm = 1.770 Ωm @ 87.000 °F
Rmc = 1.824 Ωm @ 88.000 °F
Rmf = 1.780 Ωm @ 85.000 °F
2007-07-28 THIRD
Rm = 0.568 Ωm @ 185.000 °F (MRT, 6381.000 ft)
Rmf = 0.477 Ωm @ 185.000 °F (MRT, 6381.000 ft)
Rm = 1.200 Ωm @ 84.000 °F
Rmc = 1.590 Ωm @ 79.000 °F
Rmf = 1.030 Ωm @ 82.000 °F
2007-07-28 TWO
Rm = 0.796 Ωm @ 130.000 °F (MRT, 5615.000 ft)
Rmf = 0.669 Ωm @ 130.000 °F (MRT, 5615.000 ft)
Rm = 1.200 Ωm @ 84.000 °F
Rmc = 1.590 Ωm @ 79.000 °F
Rmf = 1.030 Ωm @ 82.000 °F

Change log


29472 2018-03-04 10:15 dakota CLOSED, UNHANDED
29472 2018-03-04 10:08 dakota EDITED WELL METADATA
29472 2018-03-04 10:06 dakota TAKEN
29472 2018-01-10 16:23 whdc TASK CREATED
23820 2018-01-09 14:49 SHAREPOINT IMPORT (mu2) spud_date,tperf,measured_depth,water_geochem,borehole_orientation,notes
23820 2018-01-09 14:49 TASK CREATED
6918 2017-12-08 17:08 eholmes CLOSED, UNHANDED
6918 2017-12-08 17:07 eholmes EDITED RUN THIRD (July 28, 2007)
6918 2017-12-08 17:07 eholmes ADDED RUN THIRD (July 28, 2007)
6918 2017-12-08 17:03 eholmes EDITED RUN TWO (July 28, 2007)
6918 2017-12-08 17:02 eholmes ADDED RUN TWO (July 28, 2007)
6918 2017-12-08 16:59 eholmes EDITED RUN ONE (July 23, 2007)
6918 2017-12-08 16:58 eholmes ADDED RUN ONE (July 23, 2007)
6918 2017-12-08 16:53 eholmes TAKEN
6918 2017-10-05 09:53 mloustale TASK CREATED
23820 2017-01-29 23:53 ashley CHECKED WELL METADATA (SHAREPOINT)
23820 2017-01-29 23:53 sharepoint-EF EDITED WELL METADATA (SHAREPOINT)

Well versions and related tasks

Well 03033675