QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 2003-06-08 |
Abandon date | |
Borehole orientation | Vertical |
Measured depth | 3241.000 |
True vertical depth | 3240.000 |
Tperf | 3065.000 |
Bperf | 3076.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes | Active well |
Service company | Halliburton |
Tool | HIGH RESOLUTION INDUCTION 2"=100' |
Date | 2003-06-11 |
Run number | ONE |
Driller depth | 3241.000 |
Logger depth | 3238.000 |
Log bottom | 3228.000 |
Log top | 53.000 |
Casing size | 10.750 |
Bit size | 8.750 |
Mud type | LopH-SP101 |
Mud density | 9.80 |
Mud visc (plastic) | |
Mud visc (funnel) | 35.00 |
Mud ph | 6.80 |
Mud fluid loss | 3.80 |
Sample source | FLOWLINE |
Circulation stopped time | 14:30:00 |
Logger on bottom time | 17:30:00 |
Time since circulation | |
Operating rig time | |
Notes |
30463 | 2018-04-27 09:58 | francisco | CLOSED, UNHANDED |
30463 | 2018-04-27 09:58 | francisco | EDITED WELL METADATA |
30463 | 2018-04-27 09:56 | francisco | EDITED RUN ONE (June 11, 2003) |
30463 | 2018-04-27 09:56 | francisco | TAKEN |
30463 | 2018-01-10 16:23 | whdc | TASK CREATED |
22896 | 2018-01-09 14:49 | SHAREPOINT IMPORT (mu2) spud_date,tperf,measured_depth,water_geochem,borehole_orientation,notes | |
22896 | 2018-01-09 14:49 | TASK CREATED | |
5985 | 2017-11-29 11:05 | hannaho | CLOSED, UNHANDED |
5985 | 2017-11-29 11:05 | hannaho | EDITED RUN ONE (June 11, 2003) |
5985 | 2017-11-29 11:03 | hannaho | ADDED RUN ONE (June 11, 2003) |
5985 | 2017-11-29 10:59 | hannaho | TAKEN |
5985 | 2017-10-05 09:53 | mloustale | TASK CREATED |
22896 | 2017-01-17 23:53 | ashley | CHECKED WELL METADATA (SHAREPOINT) |
22896 | 2017-01-17 23:53 | sharepoint-LR | EDITED WELL METADATA (SHAREPOINT) |
Well 03022488