QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 2014-10-29 |
Abandon date | |
Borehole orientation | Directional |
Measured depth | 7605.000 |
True vertical depth | 7601.000 |
Tperf | 6570.000 |
Bperf | 7416.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes | Active well; No perf info |
Service company | Halliburton |
Tool | ARRAY COMPENSATED TRUE RESISTIVITY DUAL SPACED NEUTRON SPECTRAL DENSITY 5"=100" |
Date | 2012-11-04 |
Run number | One |
Driller depth | 7605.000 |
Logger depth | 7606.000 |
Log bottom | 7594.000 |
Log top | 1203.000 |
Casing size | 10.750 |
Bit size | 8.750 |
Mud type | LSND/WBS |
Mud density | 10.20 |
Mud visc (plastic) | |
Mud visc (funnel) | 43.00 |
Mud ph | 7.70 |
Mud fluid loss | 5.50 |
Sample source | FLOWLINE |
Circulation stopped time | |
Logger on bottom time | 02:11:00 |
Time since circulation | 11.190 |
Operating rig time | |
Notes | Fluid Loss in CPTM |
30565 | 2018-05-01 10:40 | francisco | CLOSED, UNHANDED |
30565 | 2018-05-01 10:40 | francisco | EDITED WELL METADATA |
30565 | 2018-05-01 10:38 | francisco | EDITED RUN One (Nov. 4, 2012) |
30565 | 2018-05-01 10:36 | francisco | TAKEN |
30565 | 2018-01-10 16:23 | whdc | TASK CREATED |
22825 | 2018-01-09 14:49 | SHAREPOINT IMPORT (mu2) spud_date,measured_depth,water_geochem,borehole_orientation,notes | |
22825 | 2018-01-09 14:49 | TASK CREATED | |
5913 | 2017-11-28 15:54 | eramirez | CLOSED, UNHANDED |
5913 | 2017-11-28 15:54 | eramirez | EDITED RUN One (Nov. 4, 2012) |
5913 | 2017-11-28 15:54 | eramirez | EDITED RUN One (Nov. 4, 2012) |
5913 | 2017-11-28 15:53 | eramirez | ADDED RUN One (Nov. 4, 2012) |
5913 | 2017-11-28 15:46 | eramirez | TAKEN |
5913 | 2017-10-05 09:53 | mloustale | TASK CREATED |
22825 | 2017-01-17 23:53 | ashley | CHECKED WELL METADATA (SHAREPOINT) |
22825 | 2017-01-17 23:53 | sharepoint-LR | EDITED WELL METADATA (SHAREPOINT) |
Well 03054945